The LED supply unit is placed within the transverse section (A1-C1 or A3-C3). The unit is powered from the 
central box using a Hirschmann terminal. 

The  LED  supply  unit  contains  a  220/24  V  transformer,  LED  io  receiver,  connecting  box.  The  unit  can  be 
removed from the transverse section. 

 

 

 

 

 

 

 

It is possible to equip the pergolas with LED strip lighting 

 24 V DC, warm white colour, CRI 90+. The LED 

strips are integrated from below in the drainage channel, the strips are located on both longitudinal sides of 
the pergola (A1-A3 and C1-C3). 
The LED strips are powered using cables with screw connectors for fast connection. 

THE  ACTUAL  EXECUTION  OF  THE  INDIVIDUAL  POWER  SUPPLY  UNITS  MAY  DIFFER  ACCORDING  TO  THE 
METHOD OF CONTROL, NUMBER OF MOTORS, AND INSTALLED TYPE OF LIGHTING! 

Multi-motor Pergolas 

Controls are carried out by Situo 5 Variation io controller (or other types of controllers). 
If  the  pergola  is  supplied  with  a  controller,  the  individual  motors  are  paired  up  with  the  controller  incl. 
lighting, and they are set to the end positions of the motors (start and end position of the slats). 
If the controller is not supplied, only the end positions of the motors are set. In such cases, the motors must 
be paired up with the controller before the assembly. In doing so, it is necessary to remove the central power 
supply box from the upper section, see fig. below, open the box and use the Wago clamps to leave only one 
motor energised and pair the motor (only one motor may be energised in order to pair it with the controller). 

DO NOT ALTER THE ADJUSTMENT OF END POSITIONS, AS THIS WILL LIKELY CAUSE THEIR COLLISION AND 
DAMAGE!!! 

 

 

 

Summary of Contents for ARTOSI

Page 1: ...ricity connections integration of the pergola to the house etc When the pergola is mounted properly slats dropping is made in direction from the motor to the other side Water drainage has to be thus a...

Page 2: ...MEASUREMENT AND ASSEMBLY MANUAL Validity of the manual 21 3 2022 2 Variant B Variant C...

Page 3: ...at least concrete feet have been prepared in advance or a flat surface is available to which the pergola is to be installed The recommended minimum foot dimensions are 300 300 mm frostproof depth A 1...

Page 4: ...pole A1 and pole C1 so that the pre installed 6HR screws fit in the grooves Tighten the pre installed 6HR screws on both sides of the perimeter section A1C1 A 10 Insert two cup head bolts M10 20 to ea...

Page 5: ...MEASUREMENT AND ASSEMBLY MANUAL Validity of the manual 21 3 2022 5 GROUND MOUNTING variant A FIGURES TO ILLUSTRATE THE ABOVE ACTIVITIES...

Page 6: ...MEASUREMENT AND ASSEMBLY MANUAL Validity of the manual 21 3 2022 6...

Page 7: ...MEASUREMENT AND ASSEMBLY MANUAL Validity of the manual 21 3 2022 7...

Page 8: ...MEASUREMENT AND ASSEMBLY MANUAL Validity of the manual 21 3 2022 8...

Page 9: ...tallation of the pole A3 and pole C3 Then proceed in accordance with items A 1 through A 4 above B 3 Insert the perimeter section A1A3 to the pre installed pole A3 and press it against the wall mounti...

Page 10: ...MEASUREMENT AND ASSEMBLY MANUAL Validity of the manual 21 3 2022 10 Wall Mounting Variant B figures to illustrate the above activities B5 B6...

Page 11: ...n both sides of the pergola and the flatness of the perimeter section C 2 Remove the eaves gutter from the perimeter section A1A3 the gutter is not treated with sealing compound at the lower side C 3...

Page 12: ...MEASUREMENT AND ASSEMBLY MANUAL Validity of the manual 21 3 2022 12 WALL MOUNTING VARIANT C FIGURES TO ILLUSTRATE THE ABOVE ACTIVITIES C3...

Page 13: ...MEASUREMENT AND ASSEMBLY MANUAL Validity of the manual 21 3 2022 13 C6...

Page 14: ...MEASUREMENT AND ASSEMBLY MANUAL Validity of the manual 21 3 2022 14 STRUCTURAL PARTS TO BE TREATED WITH SEALING COMPOUND Silicone gutter corner...

Page 15: ...al junction box is located in the section A1 A3 or C1 C3 together with the motors and ensures 220 V power supply for the motors and LED lighting unit The junction box can be removed if necessary to pa...

Page 16: ...DIFFER ACCORDING TO THE METHOD OF CONTROL NUMBER OF MOTORS AND INSTALLED TYPE OF LIGHTING Multi motor Pergolas Controls are carried out by Situo 5 Variation io controller or other types of controller...

Page 17: ...nstalling screen roller blinds If a larger box is used and the roller blinds are attached to the pergola corner joints the rear sides of the boxes will collide and in such a case neither roller blind...

Page 18: ...la is delivered with an IO controller the individual motors are paired with the controller and the extreme positions of the motors are set start and end position of the slats If the IO remote control...

Page 19: ...a year in spring and before winter treat the rubber seal with a product designed for this purpose silicone spray etc Continuously remove coarse dirt such as twigs and branches from the slats of the pe...

Page 20: ...NT AND ASSEMBLY MANUAL Validity of the manual 21 3 2022 20 Pergola Anchoring Template The through hole is always oriented to the exterior side of the pergola View of the foot from the inner side of th...

Page 21: ...MEASUREMENT AND ASSEMBLY MANUAL Validity of the manual 21 3 2022 21 Construction readiness...

Reviews:

Related manuals for ARTOSI