MEASUREMENT AND ASSEMBLY MANUAL
Validity of the manual: 21.3.2022
1
PERGOLA ARTOSI
Measurement
Always take measurements of the outer profiles of the structure.
We enter the total
width
[W],
the total
length [L]
(marked as
height
in the order form) and
passage height (H)
for each
individual pole.
When taking the measurements, it is also necessary to specify
optional accessories such as lighting, rain sensor, etc. In the order
form. It is also suitable to specify construction readiness for the
subsequent installation of the whole pergola system (anchor
points, water outflow, motor placement, electricity connections, integration of the pergola to the
house, etc.). When the pergola is mounted properly, slats dropping is made in direction from the motor to
the other side. Water drainage has to be thus always on the opposite side of the motor. There always has to
be at least one drainage groove in a pergola.
Measurements will be described in detail for each variant of the pergola types.
The supply includes a dimensional sketch of the actual order with electricity connections and water outflow
points.
Manipulation space is necessary for the installation
–
see the cross-hatched area (red) in the figures below.
Variant A
ISOTRA a.s.
Bílovecká 2411/1, 746 01 Opava
19
EN 13561:2015
ARTOSI
CPR 043/2019
Exterior Sun Screen
Wind resistance:
6
Total solar energy transmission factor gtot:
0,03 - 0,6
Summary of Contents for ARTOSI
Page 2: ...MEASUREMENT AND ASSEMBLY MANUAL Validity of the manual 21 3 2022 2 Variant B Variant C...
Page 6: ...MEASUREMENT AND ASSEMBLY MANUAL Validity of the manual 21 3 2022 6...
Page 7: ...MEASUREMENT AND ASSEMBLY MANUAL Validity of the manual 21 3 2022 7...
Page 8: ...MEASUREMENT AND ASSEMBLY MANUAL Validity of the manual 21 3 2022 8...
Page 13: ...MEASUREMENT AND ASSEMBLY MANUAL Validity of the manual 21 3 2022 13 C6...
Page 21: ...MEASUREMENT AND ASSEMBLY MANUAL Validity of the manual 21 3 2022 21 Construction readiness...