S
ERIES
E
VEN
‐
T
UBE
13
J
ULY
/25/2012
Installation Requirements
Heater Mounting
Suspension mechanism must allow for lateral tubing expansion. A minimum 12" length welded link
chain with a working load limit of at least 200 lbs. is recommended (refer to figure below for more
details).
Close all open ended S hooks and turnbuckles to avoid unhooking chain with
inadvertent contact.
Note:
Minimum mounting height is 7’ in Canada and 8’ in the US.
Concrete Beam
Turnbuckle
Beam Clamp
24"
Min.
3/8"
Threaded
Rod
I-Beam
I-Beam
12"
Min.
Anchor
12"
Min.
Truss
Eye Bolt
Wood Beam
Note:
Close all
"S" Hooks,
Turnbuckles,
"J" Bolts.
Use
"S" Hooks,
or Chain Link.