
RBU100H operation manual
8 Maintenance and hardware diagnostics
-25-
Checking
Item
Method
Criterion
replacement and splitting caused by
overheating.
visual
examination
Ensure that there is no offline.
Visual
examination or
remove one
ending to
coagulate or
measure with
multimeters
The resistors are in
±10% of the standard
value.
Control
circuit
PCB and
plugs
Ensure there is no loose screws and
contactors.
Fasten up
NA
Ensure there is no smelling and
color-changing.
Smelling and
visual
examination
NA
Ensure there are no crackles,
damage distortion and rust.
Visual
examination
NA
Ensure there is no weeping and
distortion to the capacitors.
Visual
examination or
estimate the
usage time
according to
the
maintenance
information
NA
Cooling
system
Cooling
fan
Estimate whether there is abnormal
noise and vibration.
Hearing and
Visual
examination or
rotate with
hand
Stable rotation
Estimate there is no losses screw.
Tighten up
NA
Ensure there is no color-changing
caused by overheating.
Visual
examination or
estimate the
usage time
NA
Summary of Contents for RBU100H
Page 1: ...RBU100H Regenerative Energy Unit...
Page 33: ...66001 00144...