
RBU100H operation manual
4 Installation guidelines
-10-
(2) Fix the screws or bolts to the marked locations.
(3) Position the drive onto the wall.
(4) Tighten the screws in the wall securely.
Figure 4-1 Installation space
Note: The minimum space of B and C is 100mm.
Multiple vertical installation
Figure 4-2 UP/DOWN installation
Note:
Windscreen should be added in vertical installation for avoiding mutual impact and insufficient
cooling.
Summary of Contents for RBU100H
Page 1: ...RBU100H Regenerative Energy Unit...
Page 33: ...66001 00144...