Rainstore

3

 Storm Drainage Detention & Exfiltration with Geotextile Fabric 

7

 

5.8 Wrap Geotextile

:  

 

A.

 

After the second layer of geogrid is installed, the anchored geotextile fabric 
surrounding the Rainstore

3

 installation can be wrapped around all sides and the 

top of the Rainstore

3

 chamber. 

 
B.

 

Remove anchor material from the geotextile fabric.  Enclose the Rainstore

3

 cells 

by bringing the fabric around the sides to the top of the cells. Seams should be 
sealed according to manufacturer recommendations.  

 

5.9 Add Maintenance Ports/ Connect Inlet & Outlet Pipes:

 

A.

 

Prefabricated boots are available to provide a water tight connection between the 
Rainstore3 units and any maintenance ports, inlet or outlet pipes. This replaces 
securing the geotextile fabric around a pipe using a hose clamp. The 
prefabricated boots are available from any geotextile manufacturer.   

B.

 

Boot Pipe Installation  (from Environment Protection, Inc. 
www.geomembrane.com) 

a.

 

Prepare the sub grade around the area of the pipe. The sub grade must be 
smooth, uniform, and free of any protrusions.  

b.

 

Clean the surface of the liner around the penetration where the boot will 
be welded in place. Wipe away any dirt or dust particles. The surfaces of 
the liner, boot, and the pipe must be completely clean and dry. 

c.

 

Slide the boot sleeve on the pipe, making sure the boot is aligned and all 
surfaces are smooth. It may be necessary to trim the excess tapered 
portion of the boot sleeve. 

d.

 

Weld the boot apron to the liner using adhesive. Apply the adhesive to the 
liner and the boot apron. Let the adhesive setup for several seconds before 
pressing the boot apron and the liner together using a roller. Make sure to 
smooth out any bubbles or wrinkles. 

e.

 

Seal the boot sleeve to the pipe using the stainless steel hose clamp. The 
clamp around the pipe will form a watertight seal to the pipe. 

 

C.

 

Maintenance ports/boots and pipes should be completely sealed to the 
impermeable PVC liner per manufacturer’s requirements. 

 

5.10 Side Backfill & Compaction:

  

A.

 

The area around the installed Rainstore

structure must be backfilled with self 

containing structural aggregate. The fill material should be applied gradually. The 
fill should be compacted in a maximum of 12-inch high lifts to 95% proctor 
density. Backfill to the top of the geotextile wrapped Rainstore

structure. 

 

B.

 

To ensure the backfill is properly compacted, have a Geotechnical Engineer test 
the fill density on site. 

 

5.11 Geogrid - Third Layer: 

  

Summary of Contents for Rainstore3

Page 1: ...d CANNOT be planted directly above a complete Rainstore3 system The deep tree roots can damage the water storage capacity of the system by tearing the geotextile fabric and clogging Rainstore3 cells w...

Page 2: ...r installation instructions 3 Equipment Requirements A A powered lift to move stacked Rainstore3 cells into the excavated area A back hoe can have a fork or hanging chain attachment for lowering Rains...

Page 3: ...e requirements could result in breach of the product warranty 4 3 Inclement weather A Install Rainstore3 only if the outside air temperature is 55 degrees Fahrenheit or above The plastic becomes britt...

Page 4: ...An overflow pipe should be located at the top of the system 5 2 Geogrid First Layer A Three separate layers of geogrid are required for the Rainstore3 system Geogrid arrives in rolls and can be shipp...

Page 5: ...s should overlap 12 inches Seams can be joined with duct tape or a similar material to prevent shifting of the geotextile fabric C Be sure to leave excess fabric on all sides of the excavated area The...

Page 6: ...e paper divides the stacked cells remove and discard that as well E Final positioning of cells should be done by hand by at least two workers The cells are placed side by side with the grid side down...

Page 7: ...t will be welded in place Wipe away any dirt or dust particles The surfaces of the liner boot and the pipe must be completely clean and dry c Slide the boot sleeve on the pipe making sure the boot is...

Page 8: ...density Use a walk behind roller for small installations B For installations with an area of 1 000 square feet or more a light drivable roller such as the Bomag 125 D 4 that weighs 3 125 kgs 6890 lbs...

Reviews: