background image

Rainstore

3

 Storm Drainage Detention & Exfiltration with Geotextile Fabric 

8

 

A.

 

When the side backfill compaction is complete, the third layer of geogrid is ready 
for installation. The final layer of geogrid must extend beyond all sides of the 
Rainstore

installation at least three feet. The third layer helps dissipate the load of 

traffic. Have two workers unroll the geogrid. Make sure the seams overlap at least 
12 inches.  

 

5.12 Top Backfill:

   

A.

 

Add the top layer of backfill material over the geogrid material. The backfill must 
be compacted in six inch high lifts to 95% proctor density.  Use a walk behind 
roller for small installations.  

 
B.

 

For installations with an area of 1,000 square feet or more, a light drivable roller 
such as the Bomag 125 D-4  that weighs 3,125 kgs (6890 lbs) or a compacter of 
similar weight may be used for compaction after the first six inches of fill material 
have been installed. 

 
C.

 

Fill material should measure 12 inches minimum and 36 inches maximum. To 
ensure the backfill is properly compacted, have a Geotechnical Engineer test the 
fill density on site. 

 

5.13 Surface Material:

  

A.

 

Once compaction is complete, cover material may be placed. Landscaping 
materials such as grass, or shallow root shrubs may be planted. For parking lot 
applications:  Grasspave2, Gravelpave2, asphalt, concrete or other pavement may 
be installed. 

 

Rev 10/2011 

 

Summary of Contents for Rainstore3

Page 1: ...d CANNOT be planted directly above a complete Rainstore3 system The deep tree roots can damage the water storage capacity of the system by tearing the geotextile fabric and clogging Rainstore3 cells w...

Page 2: ...r installation instructions 3 Equipment Requirements A A powered lift to move stacked Rainstore3 cells into the excavated area A back hoe can have a fork or hanging chain attachment for lowering Rains...

Page 3: ...e requirements could result in breach of the product warranty 4 3 Inclement weather A Install Rainstore3 only if the outside air temperature is 55 degrees Fahrenheit or above The plastic becomes britt...

Page 4: ...An overflow pipe should be located at the top of the system 5 2 Geogrid First Layer A Three separate layers of geogrid are required for the Rainstore3 system Geogrid arrives in rolls and can be shipp...

Page 5: ...s should overlap 12 inches Seams can be joined with duct tape or a similar material to prevent shifting of the geotextile fabric C Be sure to leave excess fabric on all sides of the excavated area The...

Page 6: ...e paper divides the stacked cells remove and discard that as well E Final positioning of cells should be done by hand by at least two workers The cells are placed side by side with the grid side down...

Page 7: ...t will be welded in place Wipe away any dirt or dust particles The surfaces of the liner boot and the pipe must be completely clean and dry c Slide the boot sleeve on the pipe making sure the boot is...

Page 8: ...density Use a walk behind roller for small installations B For installations with an area of 1 000 square feet or more a light drivable roller such as the Bomag 125 D 4 that weighs 3 125 kgs 6890 lbs...

Reviews: