 Storm Drainage Detention & Exfiltration with Geotextile Fabric 

1

 

Rainstore

3

 Installation Instructions 

For Stormwater Drainage Detention & Retention with Geotextile Fabric  

(A separate install guide for stormwater harvesting for reuse, is available - call 800-233-
1510 or visit invisiblestructures.com) 
 

1) Introduction 

A.

 

This document describes how to properly install the Rainstore

3

 water storage 

system with geotextile fabric for stormwater drainage detention and retention. 

 

B.

 

Detention 

allows for short-term storage and release of storm water through outlet 

pipes. Nearby water treatment plants may have a limited capacity for handling 
storm water and thus, stormwater needs to be temporarily detained on site. 

 

C.

 

Retention

 allows water to recharge the ground water through exfiltration.  There 

are no standard outlet pipes from the system except in some cases when overflow 
pipes are called for. 

 

D.

 

Contractors

: Only licensed contractors should install the Rainstore

3

 system. The 

contractor should have a good performance record with similar construction 
projects. Homeowners should not install the Rainstore

3

 units themselves. 

 

E.

 

Landscaping: 

Plant only grass, flowers, or shrubs with shallow root systems over 

the installed product. Trees should be carefully planned and CANNOT be planted 
directly above a complete Rainstore

3

 system. The deep tree roots can damage the 

water storage capacity of the system by tearing the geotextile fabric and clogging 
Rainstore

3

 cells with root growth.

 

Trees can be planted around the system, or 

planted in an island of a parking lot devoid of Rainstore

cells.  Recommended 

distance from Rainstore

3

 system is 10 meters with a root barrier on the edge next 

to tree. 

 

F.

 

Warning:  

Do NOT drive motorized equipment on any portion of the Rainstore

3

 

area until installation is 100% complete.  Driving over any part of the partial 
installation could damage the geogrid, fabric, or Rainstore

3

 cells, thus 

compromising the integrity of the entire installation.  Walking on the Rainstore

3

 

units is acceptable.  

 

G.

 

Warranty:

  Invisible Structures, Inc. is not responsible for careless installations 

that do not follow the technical specifications.  The ISI warranty only covers 
Rainstore

3

 material defects.  Please see the separate warranty sheet in the 

Rainstore

3

 brochure, or call ISI at 800-233-1510. 

  

2) Material Requirements 

A.

 

Rainstore

3

: The cells arrive preassembled to the desired height. They will arrive in 

a box truck on pallets. When multiples cells are stacked on one pallet, white paper 

will divide each stack.  Do not assemble, re-stack, or disassemble units onsite as 

this will void the product warranty. 

DO NOT

 cut Rainstore

3

 units. Units must be 

installed whole.  Cutting is only permitted for maintenance port installation (see 

Summary of Contents for Rainstore3

Page 1: ...d CANNOT be planted directly above a complete Rainstore3 system The deep tree roots can damage the water storage capacity of the system by tearing the geotextile fabric and clogging Rainstore3 cells w...

Page 2: ...r installation instructions 3 Equipment Requirements A A powered lift to move stacked Rainstore3 cells into the excavated area A back hoe can have a fork or hanging chain attachment for lowering Rains...

Page 3: ...e requirements could result in breach of the product warranty 4 3 Inclement weather A Install Rainstore3 only if the outside air temperature is 55 degrees Fahrenheit or above The plastic becomes britt...

Page 4: ...An overflow pipe should be located at the top of the system 5 2 Geogrid First Layer A Three separate layers of geogrid are required for the Rainstore3 system Geogrid arrives in rolls and can be shipp...

Page 5: ...s should overlap 12 inches Seams can be joined with duct tape or a similar material to prevent shifting of the geotextile fabric C Be sure to leave excess fabric on all sides of the excavated area The...

Page 6: ...e paper divides the stacked cells remove and discard that as well E Final positioning of cells should be done by hand by at least two workers The cells are placed side by side with the grid side down...