![Inverter iV-Office Installation Instructions Manual Download Page 24](http://html1.mh-extra.com/html/inverter/iv-office/iv-office_installation-instructions-manual_2085114024.webp)
24
INSTALLATION AND ASSEMBLY
24
iV-Office ventilation device | Installation instructions
4.5 Installing the ventilation device's external termination
NOTICE
Installing on an unfinished exterior wall leads to damage to the exterior wall!
•
Only install the external termination once the exterior wall is finished and has fully dried.
NOTICE
Penetration of condensation water and/or algae accumulation around the external
termination
leads to damage to the masonry/exterior wall and/or discolouration of the façade!
• Secure sealing tape all the way around the weather protection hood before installing the
external termination.
•
Before installation, carry out a biocidal pre-treatment/water-repellent pre-treatment of the
surface around the weather protection hood (consult your planner regarding this!).
Installing the Flex Office weather protection hood
Spirit level, pen, power drill with Ø 8mm drill bit, cordless screwdriver, rawl plugs
(wallplugs for insulation for insulated exterior walls),
permanently elastic external sealant, sealing tape, screws
Requirements:
• The exterior wall is completed and even.
• The wall sleeve is installed.
►
Remove the styrofoam disc from the wall sleeve on
the exterior wall side.
►
Slide the base plate with the pre-assembled insert
onto the projecting wall sleeve.
The protective grid is directed towards the
floor.
►
Level the base plate using a spirit level.
►
Mark the four drill holes (blue arrow).
►
Drill the four holes with Ø 8 mm, min. 50 mm deep.
The installation of the external termination variants is not part of this documentation!
It can be found in the installation instructions for the respective external termination.
ø 8 mm
!
+ Simplex