345A
SAVE THESE INSTRUCTIONS
(345IO) SAND FILTER PUMP COMBO ENGLISH 7.5” X 10.3” PANTONE 295U 07/10/2019
English
Page 20
OPERATING INSTRUCTIONS (continued
)
Set operating hours for
BOOST
:
1.
Press
button to unlock the keypad.
With LED flashing
,
press
button
to set the desired operating hours.
Total of 4 settings: 36 hours,
48 hours, 60 hours and 00 (OFF). Keep
pressing
button to repeat
the cycle.
2.
With the desired hour value showing, press
button to lock the
keypad controls.
The BOOST indicator light is up when activated. The
system is now starting E.C.O. and more chlorine sanitizer production. After boost procedure
has been completed, the system will automatically switch to the normal working mode.
NOTE:
If you forget to lock the keypad controls, the system will automatically lock it and start
working 10 seconds later.
3.
Operating the system in this mode will automatically activate the pump and chlorinator, the
LED will always display the remaining
operating hours of the
pump. You need to unlock the
keypad and press
button to review the programmed boost operating hours.
4.
To cancel the boost cycle,
press
button to unlock the
keypad
, then press
button
and reset the hour to
“00”.
Set
electrode Self-Clean cycle time:
The default self-clean
cycle time is
14 hours.
To adjust
the self-clean cycle time:
1.
Press
button to unlock the keypad and the LED display is
flashing.
Depending on your pool water calcium hardness level, press
button to select the self-clean cycle time as below.
Total of 3
settings: 14 hours, 10 hours and 06 hours.
2.
With the desired hour value showing, press
button to lock the keypad controls.
The
system will reverse the polarity of the electrode
(48)
every time according to the selected
hours.
NOTE:
If you forget to lock the keypad controls, the system will automatically lock it and start
working 10 seconds later.
Calcium Hardness
Self-clean cycle time
0 - 150 ppm
Reverse polarity every 14 hours
150 - 250 ppm
Reverse polarity every 10 hours
250 - 350 ppm
Reverse polarity every 06 hours