1BChapter 2: Installation
3. Mount the camera to the ceiling using the appropriate fasteners. See
“Mounting the dome cameras on a ceiling ” on page 11.
4. Set up the camera’s network and streaming parameters so that the camera
can be controlled over the network. See “Chapter 3 Network and streaming
configuration” on page 15.
5. Program the camera to suit its location. See “Chapter 4 Camera
configuration” on page 27.
To quickly put the wedge dome camera into operation:
1. Prepare the mounting surface.
2. Connect the power and network cables to the camera. See “Wedge dome
camera connections” on page 8.
3. Mount the camera to the ceiling using the appropriate fasteners. See
“Mounting the wedge dome cameras on a ceiling” on page 11.
4. Set up the camera’s network and streaming parameters so that the camera
can be controlled over the network. See “Chapter 3 Network and streaming
configuration” on page 15.
5. Program the camera to suit its location. See “Chapter 4 Camera
configuration” on page 27.
Connecting the devices
A qualified service person, complying with all applicable codes, should perform
all required hardware installation.
6
TruVision IP Dome Open-Standards User Manual
Summary of Contents for TruVision TVD-M1210V-2-N
Page 1: ...TruVision IP Dome Open Standards User Manual P N 1076511A EN REV 1 0 ISS 07OCT11 ...
Page 18: ...1BChapter 2 Installation 14 TruVision IP Dome Open Standards User Manual ...
Page 50: ...4BChapter 5 Camera management 46 TruVision IP Dome Open Standards User Manual ...
Page 58: ...5BChapter 6 Camera operation 54 TruVision IP Dome Open Standards User Manual ...
Page 64: ...8BAppendix C Warranty and contact information 60 TruVision IP Dome Open Standards User Manual ...
Page 67: ......
Page 68: ......