v240C – Marine Satellite Communication System
36
11. Detachment of the Upper Antenna
In order to attach lifting
straps, the following
steps must be performed.
This is the initial position
of the EL Arm fixture bolt.
The initial position should
be moved to the middle
tap as indicated on left.
A.
B.
C.
Summary of Contents for v240C
Page 1: ...Marine Satellite Communication Antenna System v240C Installation and Operation Manual...
Page 2: ......
Page 4: ...INDEX...
Page 6: ...v240C Marine Satellite Communication System 6...
Page 16: ...v240C Marine Satellite Communication System 16 Tools required for Installation...
Page 23: ...23 INSTALLING THE ANTENNA Remove the wall as shown left D...
Page 54: ...v240C Marine Satellite Communication System 54...
Page 134: ...v240C Marine Satellite Communication System 134...