True Scale Fabric Switches 12000 Series Hardware
July 2015
Installation Guide
Order Number: G91928004US
21
12000 Series Switches
2.4
12800-040 Installation
Note:
The following procedures are for installing the switch using variable distances between
the front and rear rack posts.
2.4.1
Mounting Hardware Kit Contents
Note:
The mounting kit contains all of the necessary parts for installing and mounting the
switch into a 19" 4-post server rack, with a distance between front and rear rack posts
ranging from 28" - 33" (711mm - 838mm).
• Support Rails
• HAT Brackets
• C-Brackets
• #8–32 Flat Head Screws
• M6 Mounting Screws
• M6 Clip Nuts
2.4.2
Installation Tasks
1. Install the clip nuts. Install M6 clip nuts in the following locations on EIA rails:
For improved stability, orient the clip nuts as shown (that is, orient the flanges
horizontally):
Figure 10.
Clip Nut Installation Locations