Initial PDM Setup 2
28
2 Initial PDM Setup
Note:
The two vertical blue lines on the graph near the top of the screen show
the start and end time for the basal segment. The selected basal rate for the
segment is shown between the two vertical lines.
3. Check the values of your start and end times and the basal rate. Then tap
NEXT
.
Define additional segments
If the Basal Program does not cover 24 hours, you must add additional segments:
1. Tap the
End Time
field and select the duration of the next segment.
2. Tap the
Basal Rate
field and select the basal rate for the segment.
3. Review the segment details and the graph.
4. Tap
NEXT
to move to the next segment.
5. Repeat the preceding steps as needed until your final segment ends at
midnight.
After specifying a basal rate for the final segment, your Basal Program is complete.
Review the Basal Program
The next screen summarises the start and end times, duration and basal rate for
each segment of the Basal Program.
1. Tap CONTINUE to review your Basal
Program.
2. Check that the graph and the
individual segment values are correct.
The total daily amount of basal insulin
to be delivered by this Basal Program
is listed below the graph.
3. To change an end time or basal rate for
a segment:
a. Tap the row containing the
segment you would like to change.
b. Tap the
End Time
field and enter
the new end time for the segment.
c. Tap the
Basal Rate
field and enter
the desired basal rate.
d. Tap
NEXT.
e. Then define the end time and basal
rate for any following segments, as needed.
Effective Date: 27SEP2019, ECO-000240
Summary of Contents for INT2-D001-MM-OUS2
Page 11: ...x Thispageintentionallyleftblank Effective Date 27SEP2019 ECO 000240...
Page 17: ...xvi Thispageintentionallyleftblank Effective Date 27SEP2019 ECO 000240...
Page 37: ...20 Thispageintentionallyleftblank Effective Date 27SEP2019 ECO 000240...
Page 53: ...36 Thispageintentionallyleftblank Effective Date 27SEP2019 ECO 000240...
Page 73: ...56 Thispageintentionallyleftblank Effective Date 27SEP2019 ECO 000240...
Page 85: ...68 Thispageintentionallyleftblank Effective Date 27SEP2019 ECO 000240...
Page 141: ...124 Thispageintentionallyleftblank Effective Date 27SEP2019 ECO 000240...
Page 177: ...160 Thispageintentionallyleftblank Effective Date 27SEP2019 ECO 000240...
Page 211: ...194 Thispageintentionallyleftblank Effective Date 27SEP2019 ECO 000240...
Page 221: ...My Notes Effective Date 27SEP2019 ECO 000240...