e) FITTING CASE:
-
Attach the Earth wire connection to bottom of stainless steel boiler-case using M4 screw &
washer supplied.
-
Position the case close to the wall-mounted boiler and plug-in the FOUR communications-
leads:
1)
From LCD screen to main circuit board (white cable with 6-pin plug)
2)
From circular Sensor-PCB to small circuit board (black cable
–
4-pin plug)
3)
From side of plastic cup-aperture to small circuit board (black cable
–
3-pin plug)
4)
From other side of plastic cup aperture to small circuit board (black cable
–
2-pin plug)
-
With the communications leads and Earth wire connected, carefully offer up the boiler case
to the wall-mounted boiler chassis, ensuring that the water-valve outlet pipe locates into the
slot-opening in the plastic cup aperture. (Check that no cables are trapped)
-
Secure case in position using M4 screw (supplied) at top and bottom of the case.
f) FITTING SPILL-TRAY AND BRACKET:
-
Attach spill-tray bracket to under-side of boiler case (use 3 x M4 screw provided)
-
Slide spill-tray into position
**********************************************************
OPERATION
First use (once water and electrical connections have been made);
-
Switch the power and water supply on. Screen will light up Red and will run through an initial
self-
diagnostic check before starting to fill with water (screen reads; “NOT READY FILLING”).
-
Once primed with water, the boiler will begin to heat (screen reads
; “NOT READY HEATING”).
-
When the correct temperature is achieved, the display will change from Red to White and will
read “READY”, displaying the water temperature in degrees C.
A warning message (CAUTION HOT WATER) will also be displayed and the
‘
touch-free
’
sensor
will illuminate.
-
The boiler will then continue in a heat/fill cycle until the tank is at full capacity. (During the
heat/fill cycle, small amounts of water are added to ensure the water is always at the correct
temperature).
IMPORTANT NOTE: In normal daily use, the boiler may be used as soon as the READY indicator comes
on, but on first install, wait 15 minutes before starting to use.
-
The boiler is now ready for use.
-
Place cup/teapot on spill-tray within cup recess, breaking the safety light-beam (illuminated
touch-free sensor will glow brighter to indicate that it is ready to dispense).
-
Place hand in front of the
‘
touch-free
’
sensor to dispense hot water.
“
CAUTION BOILING
WATER” message will flash reminding the user to
exercise caution.
NOTE: The boiler will dispense “on
-
demand” which is the default setting (e.g.
hold hand in
front of sensor to dispense hot water
–
remove hand to stop dispensing). See below for
optional
“TIMED”
dispense: