![Inspur NF5486M5 User Manual Download Page 19](http://html.mh-extra.com/html/inspur/nf5486m5/nf5486m5_user-manual_2069406019.webp)
13
Operations
4 Operations
4.1 Power up the Server
Insert the power cord plug, then press the Power Button.
4.2 Power down the Server
WARNING:
To reduce the risk of personal injury, electric shock, or damage to the
equipment, remove the power cord to remove power from the server. The front panel
Power Button does not completely shut off system power. Portions of the power supply and
some internal circuitry remain active until AC power is removed.
IMPORTANT:
If installing a hot-plug device, it is not necessary to power down the server.
1.
Back up the server data.
2.
Shut down the operating system.
3.
Disconnect the power cords.
The system is now without power.
4.3 Extend the Server from the Rack
1.
Extend the server from the rack.
2.
Rails are divided into two sections to slide out, that is:
1)
When 0~55 hard drivesneed maintenance, only pull out the first part of the rails, about
500mm (19.7 inches), and open the front access panel.
2)
When the whole machine needsmaintenance, pull out the rails completely, about 930mm
centimeters (36.6 inches), you need to unlock the buckles on both sides of the rails so that
you can extend the chassis from the rack completely (Note: When the chassis should be
extended completely, make sure that the rear cables have all been removed).
3)
If it needs to remove the server from the rack, remove all the hard drives in advance.
Summary of Contents for NF5486M5
Page 1: ...Inspur Server User Manual NF5486M5 ...
Page 24: ...18 4 Remove the fan bracket from the chassis as shown by and remove the fan as shown by ...
Page 36: ...30 4 Remove the air baffle vertically and replace it with a new one ...
Page 112: ...106 ...
Page 113: ...107 BMC Settings ...
Page 114: ...108 ...
Page 115: ...109 BMC Settings ...
Page 120: ...114 ...
Page 121: ...115 BMC Settings ...
Page 122: ...116 ...