7 UNPACKING AND PLACING

At  all  times,  machine  is  sent  after  being
meticulously tested in our factory and confirmed
they are fully operational.

Manufacturer  company  is  not  responsible  of
the damages occurred during transportation.

7.1

Remove the package after the machine arrives

and  make  sure  that  none of  the  pieces  were
damaged  during  transportation.  If  any  damages
are  determined,  do  not  install  the  machine  and
notify authorized technical service.

7.2

Use proper equipment to avoid damaging the

machine while removing the package.

7.3

All packages (plastic, polyurethane materials,

woods, nails,  etc.) are  dangerous  and  should  be
kept away from children.

9.2

Position of the machine should be compatible

with  general  installation.  Foundation  should  be
flat  and  tiling  should  not  be  damaged  by  the
weight of the machine.

9.3

Make sure the machine is positioned in the

right way for maintenance. Place the machine on
the balance by using screwed feet. Image 5.

Warning:
Do not drag the machine! It will damage the
machine’s structure.

Image 5

8 REQUIRED AREA FOR OPERATION
AND MAINTENANCE

Explanations in Article 5 and Article 6 should be
considered  in  determining  the  required  area  for
operation and maintenance.

9 WORKING ENVIRONMENT
TEMPERATURE

Machine should not be installed or used in
places, where the temperature may go below 0°C.

Summary of Contents for BKE2000L

Page 1: ...UZU TR USER S MANUAL EN 2000Tabak saat KURUTMA T NELL KONVEY RL 2000 Plate hour DRYING TUNNEL CONVEYOR BULA IK YIKAMA MAK NASI DISHWASHING MACHINE MODEL BKE2000L BKE2000R Revizyon No 00 Y r rl l k Tar...

Page 2: ...2...

Page 3: ...plam Elektrik Kapasitesi Total electricity capacity kW 31 Elektrik Giri i Total electricity capacity V 380 400V 3N AC 50 60Hz Kablo Kesiti Cable section mm2 4x16 10 Net A rl k Net weight Kg 450 L Sol...

Page 4: ...k vb bula klar zel olarak tasarlanm kasalar i erisinde y kamak i in dizayn edilmi tir Cihaz s rekli bu i i in tahsis edilmi kalifiye bir eleman taraf ndan kullan lmal d r yi bir y kama kalitesi i in...

Page 5: ...500 C civar nda su girece i dikkate al narak belirlenmi tir So uk su giri lerinde boyler ve tank s t c lar n n al ma ortam na g re boyutland r lmas yap l r Kurutma Makinan n istenilen standartlarda i...

Page 6: ...ajlar Plastik poli retan malzeme tahta ivi vb tehlikeli oldu u i in ocuklar n ula amayaca yerlere konulmal d r 9 2 Makinenin pozisyonu genel kurulumuna uyum g stermeli Zemin d z ve d emesi makinenin a...

Page 7: ...ye yandaki gibi ba lay n d1 Pano zerindeki kapa y ld z u lu tornavida yard m ile c vatalar n saat y n tersine evirerek kar n d2 Paslanmaz kapa panonun yan taraf na kald r n d3 Bara kutusu zerindeki PV...

Page 8: ...ebeke suyunda a r bir mineral yo unlu u var ise makinenin su giri inden nce mineral z c bir sistem montaj yap lmal d r B ylece su sertli i a a daki tabloda belirtilen de erler aras na d ecektir Tablo...

Page 9: ...anseri 25 ve 24 nolu terminallere direkt olarak ba lamay n ve ba lant y uygun r le kullanarak yap n b Y zey aktif dispanserin tesisat Y kama tank n n yan nda durulama b l m n n alt ndaki delik deterja...

Page 10: ...ana gelen yang n s nd rmek i in su kullanmay n z onun yerine toz i erikli yang n s nd rmeleri kullan n z Korumalar de i tirmeyin yaln zca makine al mazken yada enerjisi kesili iken kald r n Makine bir...

Page 11: ...ipman tan nm olacakt r 13 2 BAKIM G VENL K KURALLARI Her bak m i lemi g venlik kurallar dahilinde ger ekle melidir Kumanda panelinin i inde g venli al mak i in elektrik kesicisinde i bitti inde elektr...

Page 12: ...achine should be performed in accordance with the manufacturer company s relevant instructions by someone experienced in this regard Electrical and water connections of the machine should be done acco...

Page 13: ...rbage bin skin counter and outlet counter may be installed on the device to create an integrated dishwashing system Use liquid and non lathery detergent for washing Amounts of detergent and rinse aids...

Page 14: ...g environment in cold water inlets Drying In order to ensure the drying stage meets all required standards Hard water should not be used in washing and rinsing stages Hard water leads to spots on drie...

Page 15: ...urethane materials woods nails etc are dangerous and should be kept away from children 9 2 Position of the machine should be compatible with general installation Foundation should be flat and tiling s...

Page 16: ...Connect the power source cable to the machine as shown in the image d1 Remove the screw on the panel with the help of a fillister head screw driver d2 Lift the stainless lid near the panel d3 Lift the...

Page 17: ...er inlet This way water hardness will fall down to the values shown in the table below Table 2 Connect the water inlet pipe located under the machine to a hot water pipe or a cold water pipe if the ma...

Page 18: ...sing WARNING Do not directly connect the dispensary to terminals 25 and 24 and use a suitable relay for connection b Installation of the surface active dispensary The hole under the rinsing section be...

Page 19: ...any circumstances Repair work should only be done by manufacturing company or authorized technical service with original spare parts Do not use water to extinguish a fire broke out in electrical compo...

Page 20: ...13 2 MAINTENANCE SAFETY RULES Each and every maintenance work should comply with safety rules To ensure safe work in the control panel cut the electricity off from electricity flow wall by turning it...

Page 21: ...d clean the filter Choose a longer washing period or repeat the same period 2 Dishes are broken Improper basket is used Machine is overloaded Pay attention to basket preference Comply with the machine...

Page 22: ...22 BKE 2000L R ELEKTR K EMASI ELECTRICAL SCHEDULE BKE 2000L R ELECTRICAL SCHEDULE...