10 CONNECTION TO POWER SOURCE

10.1 Electricity connection

WARNING:

All  machines  with  conveyors  will  be  fed  with  45-50

°

C hot water inlet and 400V 50Hz. A.C. electricity.

Except the detailed requests provided with the purchase order.

a
)

M
a
k
i
n
e
n
i
n

Make sure that the voltage and frequency values of the circuit is the
same as the values indicated on the machine before connection.

b)

Electricity  connection  of  the  machine  should  be  in  compliance

with  domestic  installation  regulations  (multipolar  automatic  circuit
breaker or thermic magnetic switch). Distance between the contacts
of this circuit breaker of switch should at least be 3 mm. Switch (or
automatic  circuit  breaker)  should  be  wall-mounted  somewhere
easily accessible,  not  on  the  machine  (ground  clearance  should  be
between 0,6-1,7 m).

c)

Make  sure  the  electricity  is  turned  off  before  connecting  the

machine to the power source.

d)

Connect  the  power  source cable to the machine as shown in the

image:

d1)

Remove the screw on the panel with the help of a fillister head

screw driver.

d2)

Lift the stainless lid near the panel.

d3)

Lift the PVC lid on the busbar box and connect phase cables to

busbars marked as L1, L2, and L3.

d4)

Tightly close the PVC lid on the busbar box.

d5)

Check  the  tightness  of  the  cable  connections  considering  they

may have slacked during transportation.

d6)

Reclose the stainless lid on the panel.

d7)

Use a fillister head screw driver to close the panel lid.

WARNING: Switch and power source cable connections should
be as shown in Image 6.

Installation  and  electricity  connection  of  the  device  should  be
done according to the standards by authorized personnel.

4x16+10mm

2

sized  NYY  cable  should  be used  for  electricity

connection.

Voltage tolerance should not exceed ± 10%.

Device  should  be  connected  to  the  feeding  line  through  3x63A
circuit breaker.

Device  should  certainly  be  connected  to  a  grounding  line.  DIN
VDE  0100  article  540 should be considered for this. Grounding

screw is shown as "

" on the machine.

Summary of Contents for BKE2000L

Page 1: ...UZU TR USER S MANUAL EN 2000Tabak saat KURUTMA T NELL KONVEY RL 2000 Plate hour DRYING TUNNEL CONVEYOR BULA IK YIKAMA MAK NASI DISHWASHING MACHINE MODEL BKE2000L BKE2000R Revizyon No 00 Y r rl l k Tar...

Page 2: ...2...

Page 3: ...plam Elektrik Kapasitesi Total electricity capacity kW 31 Elektrik Giri i Total electricity capacity V 380 400V 3N AC 50 60Hz Kablo Kesiti Cable section mm2 4x16 10 Net A rl k Net weight Kg 450 L Sol...

Page 4: ...k vb bula klar zel olarak tasarlanm kasalar i erisinde y kamak i in dizayn edilmi tir Cihaz s rekli bu i i in tahsis edilmi kalifiye bir eleman taraf ndan kullan lmal d r yi bir y kama kalitesi i in...

Page 5: ...500 C civar nda su girece i dikkate al narak belirlenmi tir So uk su giri lerinde boyler ve tank s t c lar n n al ma ortam na g re boyutland r lmas yap l r Kurutma Makinan n istenilen standartlarda i...

Page 6: ...ajlar Plastik poli retan malzeme tahta ivi vb tehlikeli oldu u i in ocuklar n ula amayaca yerlere konulmal d r 9 2 Makinenin pozisyonu genel kurulumuna uyum g stermeli Zemin d z ve d emesi makinenin a...

Page 7: ...ye yandaki gibi ba lay n d1 Pano zerindeki kapa y ld z u lu tornavida yard m ile c vatalar n saat y n tersine evirerek kar n d2 Paslanmaz kapa panonun yan taraf na kald r n d3 Bara kutusu zerindeki PV...

Page 8: ...ebeke suyunda a r bir mineral yo unlu u var ise makinenin su giri inden nce mineral z c bir sistem montaj yap lmal d r B ylece su sertli i a a daki tabloda belirtilen de erler aras na d ecektir Tablo...

Page 9: ...anseri 25 ve 24 nolu terminallere direkt olarak ba lamay n ve ba lant y uygun r le kullanarak yap n b Y zey aktif dispanserin tesisat Y kama tank n n yan nda durulama b l m n n alt ndaki delik deterja...

Page 10: ...ana gelen yang n s nd rmek i in su kullanmay n z onun yerine toz i erikli yang n s nd rmeleri kullan n z Korumalar de i tirmeyin yaln zca makine al mazken yada enerjisi kesili iken kald r n Makine bir...

Page 11: ...ipman tan nm olacakt r 13 2 BAKIM G VENL K KURALLARI Her bak m i lemi g venlik kurallar dahilinde ger ekle melidir Kumanda panelinin i inde g venli al mak i in elektrik kesicisinde i bitti inde elektr...

Page 12: ...achine should be performed in accordance with the manufacturer company s relevant instructions by someone experienced in this regard Electrical and water connections of the machine should be done acco...

Page 13: ...rbage bin skin counter and outlet counter may be installed on the device to create an integrated dishwashing system Use liquid and non lathery detergent for washing Amounts of detergent and rinse aids...

Page 14: ...g environment in cold water inlets Drying In order to ensure the drying stage meets all required standards Hard water should not be used in washing and rinsing stages Hard water leads to spots on drie...

Page 15: ...urethane materials woods nails etc are dangerous and should be kept away from children 9 2 Position of the machine should be compatible with general installation Foundation should be flat and tiling s...

Page 16: ...Connect the power source cable to the machine as shown in the image d1 Remove the screw on the panel with the help of a fillister head screw driver d2 Lift the stainless lid near the panel d3 Lift the...

Page 17: ...er inlet This way water hardness will fall down to the values shown in the table below Table 2 Connect the water inlet pipe located under the machine to a hot water pipe or a cold water pipe if the ma...

Page 18: ...sing WARNING Do not directly connect the dispensary to terminals 25 and 24 and use a suitable relay for connection b Installation of the surface active dispensary The hole under the rinsing section be...

Page 19: ...any circumstances Repair work should only be done by manufacturing company or authorized technical service with original spare parts Do not use water to extinguish a fire broke out in electrical compo...

Page 20: ...13 2 MAINTENANCE SAFETY RULES Each and every maintenance work should comply with safety rules To ensure safe work in the control panel cut the electricity off from electricity flow wall by turning it...

Page 21: ...d clean the filter Choose a longer washing period or repeat the same period 2 Dishes are broken Improper basket is used Machine is overloaded Pay attention to basket preference Comply with the machine...

Page 22: ...22 BKE 2000L R ELEKTR K EMASI ELECTRICAL SCHEDULE BKE 2000L R ELECTRICAL SCHEDULE...

Reviews: