5
CHECKLIST
PRE INSTALLATION
Determine type of exterior grille
Determine location of unit
Determine type of condensate drain (if used in heat mode)
Check for proper electrical connection
INSTALLATION
Holes for vents drilled per XVentBox instructions
Seal around XVentBox sleeve
Condensate drain connected
Wall bracket securely hung
Compressor unlocked
Exterior grilles installed
Unit securely mounted including anti-lifting bracket
Wall controller installed*
POST INSTALLATION
All packing materials disposed
User Guide given to owner
System tutorial to owner
Instruct owner not to use the HPAC 2.0 until an Ephoca technician inspects and certifies the system
Schedule with Ephoca inspection and certification
Unplug the HPAC 2.0 from the wall receptacle
*
For models with wall controller instead of onboard controller
Summary of Contents for Ephoca HPAC 2.0
Page 1: ...1 INSTALLATION MANUAL 2020 ...
Page 9: ...9 ...
Page 17: ...17 NOTES ...
Page 35: ...35 NOTES ...