Summary of Contents for INGECON SUN SMART

Page 1: ...tion Manual Ingecon Sun Three Phase Inverter Pg 1 de 40 Ref AAS2000IKI02 Rev _ Dec 2009 Ingeteam Energy S A Rev _ AAS2000I KI 02 12 2009 INGECON SUN SMART Ingecon Sun Three Phase Inverter Installation...

Page 2: ...npacking 8 2 2 Location 9 2 3 Disposal 11 3 Electrical Connection 12 3 1 Opening the equipment and access 13 3 2 Earth Fault Contact Grid Connection Indicator 14 3 3 Access to Auxiliary Connections 14...

Page 3: ...1 7 7 Inverter data 31 8 Troubleshooting 32 8 1 LED indications 32 8 1 1 Green LED 32 8 1 1 1 Flashing slowly 32 8 1 1 2 Flashing quickly 32 8 1 1 3 LED remains on 32 8 1 2 Orange LED 33 8 1 2 1 Flash...

Page 4: ...Sun Manager Operation Manual AAX2005IKT01 PC00ISA03 AAV2000IKR01 Ingecon Sun Three Phase 100 kW Installation Manual Ingecon Sun Commercial Catalogue CATALOGUES Ingecon Sun Single Phase Installation Ma...

Page 5: ...those areas following the safety provisions described in this manual The safety provisions described herein represent the minimum level of protection to be ensured For a higher safety level we recomm...

Page 6: ...ltage 4 Earth and short circuit the system 5 Protect yourself against any energised device in close proximity and mark the working area with safety panels if necessary Before these operations have bee...

Page 7: ...by authorised personnel during installation and tuning operations A serious risk of electric shock exists even after the device has been disconnected from the electric grid and photovoltaic panels Wai...

Page 8: ...lowing provisions strictly apply to any handling operation of the device outside the factory premises In case of non compliance with these provisions the warranty may become null and void without any...

Page 9: ...bag and bubble wrap Adequated Collection Service container Cardboard Adequated Collection Service container 2 2 Location Dust free air must be provided in the enviroment of the equipment Adequqted ai...

Page 10: ...ts power output During operation the inverter will make a slight buzzing noise Do not locate the inverter in an occupied room or on supports that could amplify this buzzing noise Install the equipment...

Page 11: ...rete slab to its borders of 72 mm Diameter of the drill on the concrete slab to its borders of 8 mm Minimun depth of thedrill on the concrete slab of 65 mm Minimun thickness of the concrete slab of 10...

Page 12: ...e inverter operates under hazardous voltages and currents The basic inverter connections should be made in the following order Connection of the insulation failure detection switch optional Connection...

Page 13: ...gloves and glasses homologued for electrical risk is compulsory to ensure lack of voltage After disconnecting the equipment from the PV array and power grid wait at least 10 minutes before opening the...

Page 14: ...in Grid connection indicator function The equipment is factory configured to perform one or other function the function option must be expressly requested when the order is sent to Ingeteam Energy S A...

Page 15: ...ssory installation manual AAX2002IKI01 Communication accessories Installation Manual 3 6 Ethernet Communication connection At the installer s request optionally the inverters may incorporate hardware...

Page 16: ...ry in order to change from one section to another The cable section shall always be based on the equipment power rating The inverter protections at the grid connection support a short circuit current...

Page 17: ...negative pole to the terminals marked If the distance between the inverter and the PV array connection point requires the use of a greater cable section then the use of an external distribution box lo...

Page 18: ...re that Q1 Q2 and Q3 MT breakers are in ON position 3 12 Hermetic seal During installation it is important to ensure that the unit s IP rating is maintained For all connections through the PG cable gl...

Page 19: ...ndition and that there are no nearby hazards which could lead to the deterioration of the cables such as intense heat sources sharp objects or devices which could impact against or pull on the cables...

Page 20: ...vated Check that the values of AC and DC voltages in Monitoring menu They should be 340V Vac1 Vac2 Vac3 440V 400 Vdc 900 Vdc shows the value of DC actual voltage Pressing OK while selecting this value...

Page 21: ...that there is no electrical contact whatsoever between either the grid or the PV panels and any part of the equipment Remember that personal protective equipment PPE is compulsory to verify that no v...

Page 22: ...information on the location of the components to be decontaminated INGETEAM ENERGY S A don t accept responsability of hazard produced by a inappropiate use of the devices Any change in the device have...

Page 23: ...inverter to their screws both top screw and bottom screw if available It s also necessary to check if there are dents scratchs and rust that will damage the cabinet IP protection If this type of defe...

Page 24: ...imilar If the filter continues dirty clean it in water at 40 C If the filter is oily or greasy replace with a new one Check the state of the air extraction ventilator Proceed to clean and replace it i...

Page 25: ...structure when you do not want to confirm a change or accept a proposed value Up This key serves to scroll up a list of parameters or files within the same level or increase the value of an editable...

Page 26: ...nt keys have in the current screen If the inverter is manually stopped instead the injected power a text with STOPPED will be shown Key functios at initial screen are Start Inverter Stop Inverter Ente...

Page 27: ...EASONS ADJUSTSMENTS INVERTER DATA 7 4 Monitoring Access by pressing OK once selected MONITORING 12 00 09 01 09 MAIN PRINCIPAL MONITORING STOP REASONS ADJUSTSMENTS INVERTER DATA Listed below is a descr...

Page 28: ...tage and the current delivered by the inverter Screen 5 Rpv Impedance between PV array and Ground Rpv Impedance between pole of PV array and Ground Rpv Impedance between pole of PV array and Ground Sc...

Page 29: ...inverter was last connected to the grid TempInt Inverter Power Electronics Temperature TempCI Inverter Control Electronics Temperature Screen 7 N Conex The number of connections to the Grid made thro...

Page 30: ...lectronics overheating SR CONFIG Stoppage due to a configuration change SR MANUAL STOP Manual stoppage SR MIN VPV Low input voltage at the panels SR HW_DESCX2 Hardware failure internal SR FAULT 1 Powe...

Page 31: ...of the display Grid Quality Grid Quality parameters can be changed here Security Code will be neccessary Grounding PV array grounding type can be modificated here Security Code will be neccessary Con...

Page 32: ...lashing slowly Flashing every 3 seconds indicates on hold status due to low radiation This alarm is triggered when the PV array is not receiving sufficient radiation to provide the inverter with the m...

Page 33: ...gy S A 8 1 3 Red LED This LED indicates that an alarm has been triggered in the inverter 8 1 3 1 LED remains on Inverter stops It indicates that the problem requires the stopping of the inverter More...

Page 34: ...id and PV array Wait at leat 10 minutes for the internal capacitance to discharge Open the inverter and check the the DC surge arrester status Each arrester has an optical indicator If the indicator i...

Page 35: ...Converter SR_ADC_LAT Internal Error of the Analog to Digital Converter 0x0080 CURR PEAK_ALARM SR_CURR PEAK Instantaneus current value out of range 0x0100 PROT_CA_ALARM SR_VARISTORS Error at AC varisto...

Page 36: ...RVDC RVDC OPTIONAL If the equipment has DC surge arresters check the status indicator If it is green they are correct if it is red replace it Check it s wires too 8 4 Disconnection from the Grid If th...

Page 37: ...oves to protect against mechanical hazards Authorised safety glasses to protect against electrical hazards Safety footwear Helmet The necessary tools to replace the electronics block are star screwdri...

Page 38: ...until the fastening clips close on the connector Extract the control board To connect a new control board follow the same steps in inverse order 8 7 Replacement of Varistors in Measure Boards The vari...

Page 39: ...Installation Manual Ingecon Sun Three Phase Inverter Pg 39 de 40 Ref AAS2000IKI02 Rev _ Dec 2009 NOTES...

Page 40: ...Ingeteam Energy S A www ingeteam com Avda Ciudad de la Innovaci n 13 31621 Sarriguren Navarra Tel 34 948 288 000 Fax 34 948 288 001 http www ingeteam com...