ABQ2026IQE01_A - Installation and Operation Manual
With bottom cover
2189 N
4363 N
3225 N
1930 N
4025 N
3010 N
2739
300
300
300
998
841
899
396
793
Footings
Area sealed for DC supply
Compulsory support points
Optional support points
Top view
CAUTION
Seal the area indicated in the previous figure to stop water, humidity and other foreign bodies from entering.
You must follow the following stipulations when choosing the place where the unit is to be bolted in:
•
Minimum distance from the center of the bore to the edge of the concrete pad: 72 mm.
•
Diameter of the hole drilled in the concrete pad: 10 mm.
•
Minimum depth of the hole drilled in the concrete pad: 65 mm.
•
Minimum thickness of the concrete pad: 100 mm.
•
Minimum depth of anchoring bolt: 45 mm.
•
Minimum tensile strength: 6.3 kN.
•
Minimum shear strength: 8.2 kN.
42
Preparation for installing the unit
Ingeteam