
ABQ2026IQE01_A - Installation and Operation Manual
6. Uninstall the four M10 screws and remove the plate shadowed in the following figure. The tightening
torque for these screws is 30 Nm.
7. The phases are joined to each other via two connection busbars. Uninstall the M8 bolts from the phase´s
plates to replace. To uninstall phases -R and -T, you must remove 16 bolts. To uninstall phases -S you
must remove 32 bolts. The tightening torque for these screws is 8 Nm.
164
Maintenance
Ingeteam