
ABQ2026IQE01_A - Installation and Operation Manual
3. Extract the fan vertically.
4. Install the new fan.
5. Screw in the fastening bolts removed in point 2 applying a 30 Nm torque with NLGI 1 anti-seize
lubricant.
6. Reinstall the aerial connector.
22.4. Corrective replacement tasks
Corrective replacement tasks aim to replace components prior to their loss of function.
Corrective replacement tasks
Element
Replacement frequency
Arrestors
After tripping
Relays
If not operative
AC thermomagnetic circuit
breaker
If not operative
Electronic devices of the
converter panel
If not operative
Electrical cards of the unit
If not operative
Power phase
If not operative
Harmonics filter
If not operative
Information stickers
If not legible
Fuses
If not operative
Display
If not operative
DC switch
If not operative
160
Maintenance
Ingeteam