4
5
VANGUARD ASSEMBLY INSTRUCTIONS
MAIN STRUCTURE ASSEMBLY
A1.
Assemble the Base Frame to the Main Upright and Base tube using 2 – 3/8” x 3”
bolts, 2 – 3/8” x 2 ¾” bolts, 8 – 3/8” flat washers and 4 – 3/8” nuts. Do not fully
tighten the bolts at this time.
A2.
Assemble the Mid-Frame to the assembly created in Step A. using 2 – 3/8” x 3 ¼”
bolts, 4 – 3/8” flat washers, and 2 – 3/8” nuts. Do not fully tighten the bolts at this
time.
A3.
Assemble the MEC Lower Attach to the assembly created in Step B. using 2 – 3/8”
x 3” bolts, 4 – 3/8” washers, and 2 – 3/8” nuts. Do not fully tighten the bolts at this
time.
A4.
Attach the One Hole Bent Pulley Bracket and the Two Hole Bent Pulley Bracket to
the MEC Lower Attach using 2 – 3/8” x 3” bolts, 4 – 3/8” washers and 2 – 3/8” nuts.
4
Base Frame
Main Upright
Base Tube
2 - 3/8" x 2 3/4" Bolts
2 - 3/8" x 3" Bolts
8 - Washers
4 - Nuts
Mid-Frame
2 - 3/8" x 3 1/4" Bolts
4 - Washers
2 - Nuts
MEC Lower Attach
2 - 3/8" x 3" Bolts
4 - Washers
2 - Nuts
A1
A2
A3
A4
VIEW FOR OPPOSITE BUILD
5
NOTE: DO NOT FULLY TIGHTEN BOLTS UNTIL AFTER
STEP B3.
1 - Bent Pulley Bracket
(1-hole)
1 - Bent Pulley Bracket
(2-hole)
2 - 3/8" x 3" Bolts
4 - Washers
2 - Nuts