20
21
VANGUARD ASSEMBLY INSTRUCTIONS
SHROUD ASSEMBLY
NOTE:
If you are not installing shrouds proceed to
Step K2
on pages 22 and 23. Then
proceed to pages 26 and 27 for placard installation. Then proceed to pages 28 and 29
for cable adjustment.
NOTE:
Some of the screws and washers are pre-installed in the frame. Some screws
and washers may be found in the shroud kit with the shrouds and shroud brackets. If
you are installing shrouds the Upper and Lower Shroud Brackets should have been
installed on page 9 of these instructions.
J1.
Attach an Angle Shroud Bracket under the top of the frame.
J2.
Attach an Angle Shroud Bracket at the bottom of the frame.
J3.
Attach the Flat Shroud using 8 – ¼” x 1 ¾” screws, 2 - ¼” x 1 ½” screws, 10 – ¼”
washers and 10 – 1” spacers. Install the eight outer screws first and then install the
top and bottom screws into the angle brackets.
20
1 - Flat Shroud*
10 - 1" Spacers*
8 - 1/4" x 1 3/4" Screws*
10 - 1/4" Washers*
2 - 1/4" x 1 1/2" Screws*
J2
1 - Angle Shroud Bracket*
1 - 1/4" x 3/4" Screw*
1 - 1/4" Washer*
1 - Angle Shroud Bracket*
1 - 1/4" x 3/4" Screw*
1 - 1/4" Washer*
J1
J2
21
*ITEMS ARE IN SHROUD BOX