Mounting and
commissioning
[email protected] | romanoff.com
6–1
6
Mounting and commissioning
6.1
Safety advices for mounting
Danger!
Only experts may work at the electrical equipment.
Danger!
Observe the mains supply to requirements of the local electricity
supply company, the VDE and the local electricity company.
Close the system always via the 5-pin power plug to the power sup-
ply. Improper connection can result in injury and damage to the sys-
tem.
Attention!
Check before connecting the system, whether the existing mains
voltage corresponds with the operating voltage of the system. If the
voltages do not match, the system can be damaged.
6.2
Mounting process
Place the system in a clean, dry place horizontally on. The ground
must be firm and level. To the machine the following work area must
be kept free: left and right of the door 1.5 m and behind the system
0.5 m. Before installation at least 1.5 m of free workspace.
Cooling air may not exceed 35 °C (95 °F) and should be free of con-
taminations.
Establish supply connections according to information in chapter 3
“technical data”:
current,
compressed air
protective gas,
cooling water and
vacuum.
Examine supply lines and connections on damages.
Only after the correct connection of all supply and connecting sys-
tems, the system may be put into operation.