
Installation
2-4
IC-SA-1511 (02/2014)
V/LNV Series Manual
2.4.3 — Combustion Chamber Drawings - Watertube/ Cast Iron Boiler Application(s)
FIGURE 2-3.
Standard Configuration for Watertube/ Cast Iron Boiler
FIGURE 2-4.
Inverted Configuration for Watertube/ Cast Iron Boiler
Q
A
L
C
C (MIN)
E
D
STANDARD
FIREBRICK
FLOOR
BLOCK INSULATION
B
F
E
D
Q
A
CL
C (MIN)
STANDARD
FIREBRICK
FLOOR
BLOCK INSULATION
B
F