Installation
2-2
IC-SA-1511 (02/2014)
V/LNV Series Manual
2.4 — Combustion Chamber Recommendations
2.4.1 — Combustion Chamber Drawings - Firetube Boiler Application
FIGURE 2-1.
Standard Configuration for Firetube Boiler
FIGURE 2-2.
Inverted Configuration for Firetube Boiler
CL
D
C (MIN)
B
E
1.5" - 2.0"
A
CL
D
C (MIN)
E
B
1.5" - 2.0"
A