Startup/Service Report
The following information should be filled in by the service technician at startup or after any adjustment to the burner.
A copy of the startup report MUST be forwarded to IC in order to validate the warranty of the burner.
Burner Model _______________ Serial Number_______________ Startup Date_______________
Adjusted by:
Date:
Accepted by:
(Signature Required)
Electric Motors
Voltage
Amperage
L1
L2
L3
L1
L2
L3
Control Voltage
Blower Motor
Air Compressor
Air-Oil or Metering
Test Conducted
Gas
Oil
Control Check
Test
Set Point
Low 50%
High
Low
50%
High
Low Water Cutoff
Firing Rate MMBtu/gph
Aux. LWCO
Stack Temp (gross) º F
High Water Cutoff
Room Temp º F
Operating Limit
O2%
High Limit
CO%
Operating Control
CO (PPM)
Stack Temp Interlock
NOx (PPM)
Flame Failure
Smoke (Bacharach)
Combustion Air Switch
Combustion Eff. %
High Purge Switch
Stack Draft “ W.C.
Low Fire Interlock
Furnace Pressure “ W.C.
Oil Pressure Switch
Blast Tube Pressure “ W.C.
Oil Valve w/P.O.C.
Interlock
Steam Pressure PSIG
Water Temp º F
High Gas Pressure
Switch
Supply Oil Pressure PSIG
Low Gas Pressure
Switch
Return Oil Pressure PSIG
Gas Valve P.O.C.
Interlock
Vacuum Oil Pump “ HG
Pilot Turndown Test
Oil Temp
Flame Signal Pilot
Atom. Air Pressure
(For Low NOx Burners)
Gas Pressure @ Burner
Manifold “W.C.
Inner Manifold
Blast Tube Temp
Interlock
Outer Manifold
FGR Line Purge Switch
Center Gas Pressure “W.C.
FGR Valve P.O.C.
Gas Pressure @ Regulator Inlet PSIG
Gas Pressure @ Regulator Outlet PSIG
Pilot Gas Pressure @ Regulator Outlet “W.C.
Flame Signal Main
Low
50%
High