
ii
IC-SA-1511 (02/2014)
V/LNV Series Manual
2.4.2 — Combustion Chamber Dimensions - Inverted/ Standard Config. Firetube
2-3
2.4.3 — Combustion Chamber Drawings - Watertube/ Cast Iron Boiler Applications 2-4
2.4.4 — Combustion Chamber Dimensions - Inverted/ Standard Config. Watertube
2-5
2.5 — Installation
2-6
2.6 — Packing Plastic Insulation Around Oven (If Dry Oven Supplied)
2-7
2.7 — Oil Piping
2-8
2.7.1 — Pressure Atomization Oil Piping
2-8
2.7.2 — Two Pipe - Single Burner Operation
2-8
2.7.3 — Suction Line Sizing
2-8
2.7.4 — Return Line Sizing
2-8
2.7.5 — Two Pipe - Multiple Burner System
2-9
2.8 — Gas Piping
2-11
2.9 — Installation Checklist
2-12
2.10 — Firing Modes
2-13
CHAPTER 3
Operation
3-1
3.1 — Preparations for Starting
3-1
3.1.1 — Oil Flow
3-2
3.1.2 — Oil Pressure
3-2
3.1.3 — Firing Preparations for Oil Burners
3-2
3.1.4 — Firing Preparations for Gas Burners
3-2
3.1.5 — Burner Settings
3-3
3.1.6 — Combustion Settings
3-3
3.1.7 — Test Equipment
3-3
3.2 — Electrical Interference Test
3-3
3.2.1 — Gas Fired
3-4
3.2.2 — Oil Fired
3-4
3.3 — Gas Pilot Flame Adjustment
3-4
3.4 — Startup Sequence
3-4
3.5 — Automatic Shutdown
3-5
3.6 — Manual Shutdown
3-5