- Check IEMCA loading and unloading system
Carrying out the maintenance activities described below requires
special knowledge. For this reason, these maintenance activities
must only be carried out by staff that has received adequate training
by the machine manufacturer!
Orientation
To ensure a safe production process, the loading and unloading system must be
regularly serviced and checked. This includes visual inspection of the work area
door, visual inspection of the entire system and assessment of the general
condition. Record the results in the customer’s service, inspection and maintenance
schedules/logs.
Due to different requirements and/or specifications of the respective
manufacturers, be sure to review the respective manufacturer's
documentation!
Requirement
When working on or in the loading and unloading system, switch off
the machine and secure it against being switched on again
The following materials and equipment is required:
- servicing, testing and maintenance schedules/logs of the customer
- Various sizes of jaw and box wrenches, and Allen keys
- Device descriptions of the loading and unloading system (manufacturer
description) and the monitoring systems used
Procedure
1. Check the driving pins.
2. Check the condition of the connecting coupling.
3. Check the IEMCA connection sleeve.
4. Check the bearings for the connection sleeve.
5. Check the guide rollers in the IEMCA.
6. Check the general condition of the work area door, e.g., for damage.
7. Log the checks in the service, inspection and maintenance schedules/logs of
the customer/INDEX.
Maintenance Summary - 2.000 Operating hours
63
Maintenance Instructions
MS32-6.2
DIM012EN - 03.06.2020
Summary of Contents for MS16-6
Page 10: ...Preface 6 Maintenance Instructions MS32 6 2 DIM012EN 03 06 2020 ...
Page 50: ...Maintenance Summary Care activities 46 Maintenance Instructions MS32 6 2 DIM012EN 03 06 2020 ...
Page 76: ...Maintenance Summary 5 Years 72 Maintenance Instructions MS32 6 2 DIM012EN 03 06 2020 ...
Page 81: ......