Checking the supply lines of add-on equipment:
1. Chip conveyor
2. Cooling oil/lubricant supply
3. Workpiece feeders (robots, bar loaders or bar loading
magazines)
4. Workpiece removal units (robots)
5. Additional or hand-held control unit
6. Other optional accessories
Have damaged cables replaced immediately by a qualified
electrician.
Visual inspection of all electrical cables.
Maintenance Summary - Care activities
16
Maintenance Instructions
MS32-6.2
DIM012EN - 03.06.2020
Summary of Contents for MS16-6
Page 10: ...Preface 6 Maintenance Instructions MS32 6 2 DIM012EN 03 06 2020 ...
Page 50: ...Maintenance Summary Care activities 46 Maintenance Instructions MS32 6 2 DIM012EN 03 06 2020 ...
Page 76: ...Maintenance Summary 5 Years 72 Maintenance Instructions MS32 6 2 DIM012EN 03 06 2020 ...
Page 81: ......