
2.
Base body (1) and clamping tube (6) are bonded together.
(LOCTITE
®
)
Example: Installation tool (Hainbuch)
Example: Remove clamping element holder and base body
Remove the base body (1) and clamping tube (6) using the installation tool, and
clean.
3. Check clamping tube (6), base body (1), and Glyd Rings
®
for damage and
wear, replace if necessary.
4. Clean clamping element holder (2) and collet (3). Grease collet (oil-resistant
grease).
5. Reinstall base body (1) and clamping tube (6). Grease the base body (1) and
clamping tube/thread (6) according to the manufacturer's instructions and
screw them back into the spindle using the installation tool.
Maintenance Summary - Care activities
39
Maintenance Instructions
MS32-6.2
DIM012EN - 03.06.2020
Summary of Contents for MS16-6
Page 10: ...Preface 6 Maintenance Instructions MS32 6 2 DIM012EN 03 06 2020 ...
Page 50: ...Maintenance Summary Care activities 46 Maintenance Instructions MS32 6 2 DIM012EN 03 06 2020 ...
Page 76: ...Maintenance Summary 5 Years 72 Maintenance Instructions MS32 6 2 DIM012EN 03 06 2020 ...
Page 81: ......