
37
INS
TALLER
U
SER
M
AINTEN
AN
CE
TECHNI
CI
AN
TECHNI
CAL
D
AT
A
Before mounting it, ensure that the gaskets are in the correct position.
In the event component lubrication (already carried out by the manufacturer) is not sufficient, remove the residual lubricant
using a dry cloth, then to ease fitting coat the parts with common or industrial talc.
6. Mount the cover (A) complete with adaptor (1) and caps (6) on the wall.
7. Assemble the flue to the collective flue exhaust system.
Once all components have been assembled properly, the exhaust flue gas will be expelled in the collective flue, the combustion air for
normal boiler operation will be aspirated directly by the shaft (Fig. 27).
C
10
≤
C
,
30
Key (Fig. C
30):
C
- Minimum gradient 1.5
%
1
2
3
3
4
5
6
7
6
8
9
A
15
14
13
12
10
11
31
Key (Fig. 31):
The C9 adaptor kit includes:
No.1 Door adaptor Ø 100 or Ø 125 (1)
No.1 Door gasket made of neoprene (2)
No.4 Screws 4.2 x 9 ST (3)
No.1 Hex headed screw M6 x 20 (4)
No.1 Flat nylon washer M6 (5)
No.2 Door hole closure metal-sheet plate plug (6)
No.1 Plug gasket made of neoprene (7)
No.1 Toothed washer M6 (8)
No.1 M6 nut (9)
The Ø 80/125 extension pipe kit includes:
No.1 Extension pipe unit Ø 80/125 (10)
The bend kit Ø 80/125 includes:
No.1 Concentric bend Ø 80/125 at 87° (11)
The kit non-return valve on flue gas Ø 80 (12) includes:
No.1 Gasket / Seal Ø 80
No.1 Non-return valve on flue gas Ø 80
No.1 Extension Ø 125
No.1 Spacer Ø 80 th. 5 mm (to be excluded for this configuration)
No.1 Information sticker
The adaptor kit includes:
No.4 (kit Ø 80/125) Hex headed screws M4 x 16 slotted screwdriver
(13)
No.1 (kit Ø 80/125) Flanged adapter Ø 80/125 (14)
No.1 (kit Ø 80/125) Concentric gasket (15)
Supplied separately (Fig. 31):
No.1 Ducting kit door (A)