1.1 INSTALLATION 

RECOMMENDATIONS.

The Mini Eolo 24 3E boiler has been designed 

for wall mounted installation only; for heating 

environments and production of domestic hot 

water for domestic use and similar purposes.

The place of installation of the appliance and 

relative Immergas accessories must have suitable 

features (technical and structural) such to allow 

(always in safety, efficiency and easy conditions):

- installation (according to the provisions of 

technical legislation and technical regulations);

-  maintenance operations (including scheduled, 

periodic, routine, special);

- removal (to outdoors in the place for 

loading and transporting the appliances 

and components) as well as the eventual 

replacement of those with appliances and/or 

equivalent components.

The wall surface must be smooth, without any 

protrusions or recesses enabling access to the 

rear part. They are NOT designed to be installed 

on plinths or floors (Fig. 1-1).

By varying the type of installation the 

classification of the boiler also varies, precisely:

Boiler type B22,

 if installed without the 2 

intake caps and with the top cover kit.

Boiler type C, 

if installed using concentric 

pipes or other types of pipes envisioned for 

the sealed chamber boiler for intake of air and 

expulsion of fumes.

Only professionally enabled heating/plumbing 

technicians are authorised to install Immergas 

gas appliances. Installation must be carried 

out according to regulation standards, current 

legislation and in compliance with local 

technical regulations and the required technical 

procedures. Installation of the Mini Eolo 24 3E 

boiler when powered by LPG must comply with 

the rules regarding gases with a greater density 

than air (remember, as an example, that it is 

prohibited to install plants powered with the 

above-mentioned gas in rooms where the floor 

is at a lower quota than the average external 

country one).

Attention:

 the manufacturer declines all liability 

for damages caused by boilers removed from 

other systems or for any non-conformities of 

such equipment. 

Before installing the appliance, ensure that it 

is delivered in perfect condition; if in doubt, 

contact the supplier immediately. Packing 

materials (staples, nails, plastic bags, polystyrene 

foam, etc.) constitute a hazard and must be kept 

out of the reach of children. If the appliance 

is installed inside or between cabinets, ensure 

sufficient space for normal servicing; therefore 

it is advisable to leave clearance of at least 3 

cm between the boiler casing and the vertical 

sides of the cabinet. Leave adequate space above 

the boiler for possible water and flue removal 

connections.

Keep all flammable objects away from the 

appliance (paper, rags, plastic, polystyrene, etc.).

Do not place household appliances underneath 

the boiler as they could be damaged if the safety 

valve intervenes with obstructed conveying 

system (the safety valve must be conveyed away 

by a draining funnel), or if there are leaks from 

the hydraulic connections; on the contrary, the 

manufacturer cannot be held responsible for any 

damage caused to the household appliances. For 

the aforementioned reasons, we recommend not 

placing furnishes, furniture, etc.under the boiler. 

In the event of malfunctions, faults or incorrect 

operation, turn the appliance off immediately 

and contact a qualified technician (e.g. the 

Authorized Technical After-Sales Centre, which 

has specifically trained staff and original spare 

parts) Do not attempt to modify or repair the 

appliance alone. Failure to comply with the above 

implies personal responsibility and invalidates 

the warranty.
• Installation Standards:
  - This boiler can be installed outdoors in a 

partially protected area. A partially protected 

area is one in which the appliance is not 

exposed to the direct action of the weather 

(rain, snow, hail, etc..).

 

N.B.:

 

a partially protected location is one in 

which the appliance is not exposed to the direct 

action of the weather (rain, snow, hail, etc..).

  - Installation in places with a fire risk is 

prohibited (for example: garages, closed 

parking stalls), gas appliances and relative flue 

ducts, flue exhaust pipes and combustion air 

intake pipes.

  - Installation is prohibited on the vertical 

projection of the cooking surface.

  - Installation is also prohibited in places/

environments that constitute common parts 

of office condominiums such as stairs, cellars, 

entrance halls, attics, lofts, escape routes, 

etc. if they are not located inside technical 

compartments under the responsibility of 

each individual building and only accessible 

to the user (for the features of the technical 

rooms, see the regulation in force.

Attention

: wall mounting of the boiler must 

guarantee stable and efficient support for the 

generator.

The plugs (standard supply) are to be used only in 

conjunction with the mounting brackets or fixing 

template to fix the appliance to the wall

; they only 

ensure adequate support if inserted correctly 

(according to technical standards) in walls made 

of solid or semi-hollow brick or block. In the 

case of walls made from hollow brick or block, 

partitions with limited static properties, or in any 

case walls other than those indicated, a static test 

must be carried out to ensure adequate support.

N.B.: the hex head screws supplied in the blister 

pack are to be used exclusively to fix the relative 

mounting bracket to the wall.

These boilers are used to heat water to below 

boiling temperature in atmospheric pressure.

They must be attached to a heating system 

suitable for their capacity and voltage.
They cannot be connected directly to low-

temperature systems.

YES

NO

Summary of Contents for MINI EOLO 24 3E

Page 1: ...MINI EOLO 24 3E Instruction and warning book 1 038773ENG ...

Page 2: ......

Page 3: ...ed in the current regulation and technical standards In compliance with legislation in force the systems must be designed by qualified professionals within the dimensional limits established by the Law Installation and maintenance must be performed in compliance with the regulations in force according to the manufacturer s instructions and by professionally qualified staff intending staff with spe...

Page 4: ...al warnings 19 2 3 Control panel 19 2 4 Using the boiler 20 2 5 Fault and anomaly signals 20 2 6 Boiler shutdown 21 2 7 Restore heating system pressure 21 2 8 Draining the system 21 2 9 Anti freeze protection 21 2 10 Case cleaning 21 2 11 Decommissioning 21 3 Commissioning the boiler initial check 22 3 1 Hydraulic Diagram 22 3 2 Wiring diagram 23 3 3 Troubleshooting 23 3 4 Information Menu 24 3 5 ...

Page 5: ...ble objects away from the appliance paper rags plastic polystyrene etc Do not place household appliances underneath the boiler as they could be damaged if the safety valve intervenes with obstructed conveying system the safety valve must be conveyed away by a draining funnel or if there are leaks from the hydraulic connections on the contrary the manufacturer cannot be held responsible for any dam...

Page 6: ...uit from freezingbyintroducingatopqualityanti freeze liquid into this circuit which is not noxious to health The instructions of the manufacturer of this liquid must be followed scrupulously regarding the percentage necessary with respect to the minimum temperature at which the system must be kept An aqueous solution must be made with potential pollution class of water 2 The materials used for the...

Page 7: ...kling or de scaling products to remove any deposits that could compromise correct boiler operation A chemical treatment of the thermal system water is required in compliance with the technical standards in force in order to protect the system and the appliance from deposits e g lime scale slurry or other hazardous deposits Water connections must be made in a rational way using the couplings on the...

Page 8: ...or the transmission of data between boiler and chrono thermostat Comando Amico Remoto Remote ControlV2 or On Off chrono thermostat electrical connections Optional The operations described below must be performed after having removed the voltage from the appliance Any thermostat or On Off environment chrono thermostat must be connected to clamps 40 and 41 eliminating jumper X40 Fig 3 2 Make sure th...

Page 9: ...ng and joining of the elements correctly Attention if the exhaust terminal and or extension concentric pipe needs shortening consider that the internal duct must always protrude by 5 mm with respect to the external duct Diaphragm installation Attention based on the boiler model checking which type of fan is installed use appropriate diaphragms For correct functioning of the boiler it is necessary ...

Page 10: ...6 Exhaust m 2 0 Terminal complete with intake exhaust vertical concentric Ø 80 125 Intake and Exhaust 33 m 2 0 m 5 5 Intake m 14 3 Exhaust m 11 0 Intake exhaust terminal vertical concentric Ø 80 125 Intake and Exhaust 26 5 m 1 6 m 4 4 Intake m 11 5 Exhaust m 8 8 Terminal complete with intake exhaust horizontal concentric Ø 80 125 Intake and Exhaust 39 m 2 3 m 6 5 Intake m 16 9 Exhaust m 13 Intake ...

Page 11: ...al can be extended to a max length of 12 linear metres using insulated pipes Fig 1 28 and limit the length of the Ø 80 normal flue pipe not insulated to just 5 metres Example of installation with direct vertical terminal in partially protected location When the vertical terminal for direct discharge of com bustionfumesisused aminimumgapof300mm mustbeleftbetweentheterminalandthebalcony above The he...

Page 12: ...re Application with side outlet Fig 1 15 Using the horizontal intake exhaust kit without the special extensions enables routing through a wall thickness of 725 mm with the left side outlet and 645 with the right side outlet Extensions for horizontal kit The Ø 60 100 horizontal intake exhaust kit can be extended up to a max horizontal length of 3000 mm includingtheterminalwithgrilleandexcluding the...

Page 13: ...bly Fig 1 20 install the concentric flange 2 on the central hole of the boiler inserting the gasket 1 and tighten using the screws in the kit Fit the male end smooth of the adapter 3 into the female end of the concentric flange 2 Imitationaluminiumtileinstallation Replacethe tile with the aluminium sheet 5 shaping it to ensure that rainwater runs off Position the fixed half shell 7 and insert the ...

Page 14: ...al wall sealing plate has been fitted this will ensure sealing and joining of the elements making up the kit Installation clearances Figure 1 23 gives the min installation space dimensions of the Ø 80 80 separator terminal kit in limited conditions Figure 1 24 shows the configuration with vertical exhaust and horizontal intake Extensions for separator kit Ø 80 80 The max vertical linear length wit...

Page 15: ...tween the pipe and flue Insulation of separator terminal kit Whenever there are flue gas condensate problems in the exhaust pipes or on the external surface of the intake pipes on request Immergas supplies insulated intake exhaust pipes Insulation my be necessary on the exhaust pipe due to excessive loss of temperature of the flue gas on their route Insulation may be necessary on the intake pipe a...

Page 16: ... terminals The exhaust terminals must be installed on external perimeter walls of the building be positioned according to the minimum distances specified in current technical standards Combustion products exhaust of natural or fan assisted appliances in open top closed environments In spaces closed on all sides with open tops ventilation pits courtyards etc direct flue gas exhaust is allowed for n...

Page 17: ...iver turn clockwise and insert the by pass anti clockwise it is excluded 1 21 KITS AVAILABLE ON REQUEST System cut off valves kit The boiler is designed for installation of system interception cocks to be placed on flow and return pipes of the connection assembly This kit is particularly useful for maintenance as it allows the boiler to be drained separately without having to empty the entire syst...

Page 18: ...l pressure point 10 Negative signal pressure point 11 Flue pressure switch 12 Flow probe 13 Flue hood 14 Safety thermostat 15 Primary heat exchanger 16 Ignition and detection electrodes 17 System expansion vessel 18 Burner 19 System pressure switch 1 22 BOILER COMPONENTS 20 Air vent valve 21 Boiler pump 22 Plate heat exchanger 23 3 way valve motorised 24 System draining valve 25 By pass 26 3 bar s...

Page 19: ...an checks efficiency of the ducting or other devices Never clean the appliance or connected parts with easily flammable substances Never leave containers or flammable substances in the same environment as the appliance Attention theuseofcomponentsinvolvinguse of electrical power requires some fundamental rules to be observed do not touch the appliance with wet or moist parts of the body do not tou...

Page 20: ...control communication 31 Low power supply voltage 37 Loss of flame signal 38 Block due to loss of continuous flame signal 43 Attention the Anomaly can be reset 5 times consecutively after which the function in inhibited for at least one hour One attempt is gained every hour for a maximum of 5 attempts By switching the appliance on and off the 5 attempts are re acquired Ignition block The boiler ig...

Page 21: ... 6 BOILER SHUTDOWN For complete boiler switch off press the off button disconnect the onmipolar switch outside of the boiler and close the gas cock upstream from the appliance Never leave the boiler switched on if left unused for prolonged periods 2 7 RESTORE HEATING SYSTEM PRESSURE Periodically check the system water pressure The boiler manometer should read a pressure between 1 and 1 2 bar If th...

Page 22: ... intake and or exhaust terminals are not blocked check activation of the no air safety pressure switch ensure activation of all adjustment devices seal the gas flow rate regulation devices if settings are modified ensure production of domestic hot water 3 1 HYDRAULIC DIAGRAM ensure sealing efficiency of water circuits check ventilation and or aeration of the installation room where provided If eve...

Page 23: ...be carried out by a qualified technician e g Authorized After Sales Technical Assistance Service Smell of gas Caused by leakage from gas circuit pipelines Check sealing efficiency of gas intake circuit The fan works but ignition discharge does not occur on the burner ramp The fan may start but the safety air pressure switch does not switch the contact over Make sure 1 the intake exhaust duct is no...

Page 24: ...ndard setting 0 instant boiler 1 Boiler with storage tank 0 Display lighting Establishes the display lighting mode Display lighting P2 Range of values which can be set Standard setting 0 Off 1 Auto 2 On 1 Off the display is always lit with low intensity Auto the display lights up during use and lowers after 15 seconds of inactivity In the case of anomaly the display flashes On the display is alway...

Page 25: ...given in the table Par 3 18 3 21 3 7 CHECKS FOLLOWING CONVERSION TO ANOTHER TYPE OF GAS After making sure that conversion was carried out with a nozzle of suitable diameter for the type of gas used and the settings are made at the correct pressure check that there is no flame in the combustion chamber the burner flame is not too high or low and that it is stable does not detach from burner the pre...

Page 26: ... its activation is signalled by the indication of the flow temperature and the flashing and symbols This function allows the technician to check the combustion parameters Once the function is activated it is possible to select whether to perform the check in CH status regulating the parameters with buttons 5 and 6 or in DHW mode opening any DHW cock and always regulate the parameters with the butt...

Page 27: ...te boiler maintenance the casing can be completely removed as follows Fig 3 4 3 5 1 Unhook the decorative frame a from the relative lower retainers 2 Remove the decorative frame a from the casing c 3 Loosen the 2 front screws b that fix the casing on 4 Loosen the 2 lower screws d that fix the casing on 5 Pull the case towards yourself c 6 Push the case c upwards at the same time to release it from...

Page 28: ...28 3 5 4 4 5 6 6 d d c INSTALLER USER MAINTENANCE TECHNICIAN ...

Page 29: ...ts should therefore be carried out using a differential manometer small U shaped column or digital manometer with the probes inserted in the pressure test gas valve outlet and on the sealed chamber positive pressuretest Thepowerdatainthetablehasbeen obtained with intake exhaust pipe measuring 0 5 m in length Gas flow rates refer to heating power below a temperature of 15 C and at a pressure of 101...

Page 30: ...urner On Off 5 60 0 06 Central heating circuit max operating pressure bar 3 Central heating circuit max operating temperature C 90 Adjustable central heating temperature C 35 85 System expansion vessel total volume l 4 0 Expansion vessel factory set pressure bar 1 Water content in generator l 2 5 Head available with 1000 l h flow rate kPa m H2 O 24 52 2 5 Hot water production useful heat output kW...

Page 31: ...SS NOZZLE BURNER GAS FLOW RATE BURNER PRESS NOZZLE BURNER GAS FLOW RATE BURNER PRESS NOZZLE BURNER kW kcal h m3 h mbar mm H2 O kg h mbar mm H2 O kg h mbar mm H2 O 24 0 20640 2 71 12 51 127 6 2 03 29 01 295 8 1 99 36 80 375 3 23 0 19780 2 60 11 53 117 6 1 94 26 65 271 7 1 91 34 07 347 4 22 5 19353 2 55 11 06 112 8 1 90 25 52 260 2 1 87 32 76 334 0 21 0 18060 2 39 9 70 99 0 1 78 22 29 227 3 1 75 28 ...

Page 32: ...rial Number CHK Check Cod PIN PIN code Type Type of installation Qnw min Minimum heating capacity domestic Qn min Minimum heating capacity heating Qnw max Maximum heating capacity domestic Qn max Maximum heating capacity heating Pn min Minimum heat output Pn max Maximum heat output PMS Maximum pressure system PMW Maximum pressure domestic D Specific flow rate TM Maximum working temperature NOx Cla...

Page 33: ...33 ...

Page 34: ...34 ...

Page 35: ...35 ...

Page 36: ...d Matejovce SK Tel 421 524314311 Fax 421 524314316 IMMERGAS SPA ITALY CERTIFIED COMPANY UNI EN ISO 9001 2015 Design manufacture and post sale assistance of gas boilers gas water heaters and related accessories This instruction booklet is made of ecological paper Cod 1 038773ENG rev ST 002116 006 07 20 ...

Reviews: