10
1-9
1-10
1-8
1-11
1-12
INS
TALLER
US
ER
MAINTEN
AN
CE TECHNI
CI
AN
VERTICAL TERMINAL KIT
FOR DIRECT DRAINING
INTAKE
COVER KIT
DIAPHRAGM
Flue gas separator adjustment.
For correct fun-
ctioning of the boiler it is necessary to regulate
the flue gas shutter positioned on the air/flue gas
sample points (Fig. 1-11).
Adjustment is carried out by loosening the
front retainer screw and moving the indicator
to the correct position, aligning its value to the
horizontal reference. Once adjustment has been
performed, tighten the screw to fix the separator.
Appropriate adjustment takes place on the basis
of the type of pipe and its extension: this calcula-
tion can be carried out using the relevant tables.
Intake diaphragm installation.
For correct boi-
ler functioning with Ø 80 separator kits and drain
measuring > 1 m a diaphragm must be installed
on the sealed chamber intake hole and before
the intake pipe (Fig. 1-12). The choice of suitable
diaphragm takes place on the basis of the type of
pipe and its maximum extension: this calculation
can be carried out using the following tables:
N.B.:
the diaphragms are supplied together with
the boiler.
The cover kit includes:
N° 1 Heat moulded cover
N° 1 Gasket clamping plate
N° 1 Gasket
N° 1 Gasket clamp
N° 1 N°1 Intake hole covering
plate
The terminal kit includes:
N° 1 Gasket
N° 1 Exhaust flange Ø 80
N° 1 Bend 90° Ø 80
N° 1 Exhaust pipe Ø 80
N° 1 Wall sealing plate