![Imesa FLATWORK IRONER Installation And Use Instructions And Warnings Download Page 13](http://html1.mh-extra.com/html/imesa/flatwork-ironer/flatwork-ironer_installation-and-use-instructions-and-warnings_2046339013.webp)
E170301x.03_EN
29/06/2022
13
Remove the door.
Pass the power cord through the hollow press on the left shoulder of the grille.
The power supply must be carried out by connecting the cable to a series of terminals (already present in the appliance):
Depending on the type of power supply provided by the serial number plate of the machine, connect the wires to the
disconnector contacts marked as follows:
: terminal for the equipotential connection with the grounding system of the user.
L1, L2, L3
: phase terminals
N
: neutral terminal
When installing or replacing the power cord, the ground conductor must be at least 5 cm longer than the others.
ATTENTION!
In the event that the intake fans are powered by a three-phase system, check that the direction of rotation of the
motors is correct and in the direction of air expulsion.
In the event that the fan motors turn in the wrong direction, reverse the position of two power phases.
ATTENTION!
In the event that the machine is with gas heating, check the correct phase and neutral position in single-phase
machines. Incorrect connection can result in the ionization sensor not being detected.
ATTENTION!
The appliance must be connected to an effective ground system: the manufacturer declines all responsibility in
the event that this connection is not carried out according to the provisions of the regulations in force on the
subject.
Before any maintenance disconnect the power supply: for maintenance refer to the wiring diagram of the machine,
inserted inside the machine or available on the manufacturer's website.
ATTENTION!
Even when the position of the main switch is "0", the cables upstream of the switch are in voltage!
10.
LEAK TEST (only for gas Ironer)
All fittings between the system and the appliance are to be subjected to a leak test. For this operation it is recommended
to use a spray for leaks; otherwise, you can brush the siding points with other foamy substances, which do not cause
corrosion. Whichever solution is adopted, bubbles should not develop. In the event that there are leaks, proceed to their
elimination.
ATTENTION!
It is absolutely forbidden to use open flames for the leak test!
11.
GAS CONNECTION: THERMAL POWER (only for gas Ironer)
All equipment during the final testing at the factory is prepared for the type of gas reported on the adhesive plate found
near the serial number plate.