PK3561_10_09 • 79 SERIES INSTALLATION GUIDE
16
2. Push in the lever catch (F) firmly. (see Fig. 2) to be flush
with drive tube diameter
2. Preparing the outside housing for the installation of the lever handle
1. Insert the cylinder (J) to be used as a tool or equivalent tool
to rotate the override shaft (L) and turn it clockwise until it stops
so that the two small indents (M) on the cross are now
vertically in line. (Fig.1)
(F)
(L)
(E)
(M)
(C)
(N)
(J)
Fig. 1
Fig. 2
lever catch (F)
Push lever
catch (F) in
1.
Upon unpacking, lock housing with mechanical override should look like the diagram below with:
(M) The small indents on the cross of the override
shaft in line Horizontally
(C) The nylon washer and the spring washer on
the drive tube
(F) The lever catch in the out position
(J) Cylinder and 2 keys for 79M keyed different only
included in the hardware bag
(F)
Override
Shaft (L)
Indents (M)
In vertical
position
(L)
(E)
Important: Assemble the lever, cylinder and lock
components before affixing the entire unit to the door.
i