iKoustic Limited,
Units 4 & 5, Erivan Park, Sandbeck Way,
Wetherby, West Yorkshire, LS22 7DN
Creating Quieter Spaces Together
www.iKoustic.com
01937 588226
[email protected]
16
• If using MuteClip XP to level uneven joists, take some time to measure the placement of the MuteClip XP’s and
Channels.
+
A laser level should be used when calculating the placement of MuteClip XP.
• Attach MuteClip Channels into MuteClip XP’s, channels must run perpendicular to the joists.
+
MuteClip Channels must overlap by 200mm, fix 4 self-tapping screws into the shoulders of the MuteClip
Channels to give a secure join.
+
MuteClip Channels must not overlap on a MuteClip XP.
•
Fix your first layer of Acoustic Plasterboard to the MuteClip Channels.
+
Acoustic Plasterboard must not be in direct contact with any adjacent surfaces. There must be a 2-5mm gap
around the perimeter of the room.
• Seal the perimeter and any other gaps with Acoustic Sealant.
• Adhere Tecsound to the Acoustic Plasterboard using Tecsound’s self-adhesive backing.
+
It may be easier to cut Tecsound into manageable sized pieces for ease of installation.
•
Fix your second layer of Acoustic Plasterboard and stagger the joins from the first layer, making sure that the
screws go into the MuteClip Channels.
+
Again, leave a 2-5mm gap around the perimeter of the room.
• Seal the perimeter and any other gaps with Acoustic Sealant.
•
Scrim tape all joins and finish with a skim plaster.
Configurations
Standard Diamond XP
Please contact iKoustic to confirm correct configurations appropriate for your system.
If you need any assistance, please call us on 01937 588 226.