iKoustic Limited,
Units 4 & 5, Erivan Park, Sandbeck Way,
Wetherby, West Yorkshire, LS22 7DN
Creating Quieter Spaces Together
www.iKoustic.com
01937 588226
[email protected]
10
Instructions
• Measure up the ceiling you will be treating and mark out the locations for the battens
(See configurations or contact
iKoustic for appropriate dimensions).
• Apply MuteStrip or Isolation Strip to the side of the timber that will be in direct contact with the ceiling.
• Ensuring the timber frame is at appropriate centres, securely anchor bolt the timber frame to the ceiling.
• Mark out the locations for the MuteClips
(See configurations or contact iKoustic for appropriate dimensions).
+
The perimeter MuteClips must be no further than 100mm from the adjacent walls.
• Screw MuteClips into the appropriate joists.
• Attach MuteClip Channels into MuteClips, channels must run perpendicular to the joists/battens.
+
MuteClip Channels must overlap by 200mm, fix 4 self-tapping screws into the shoulders of the MuteClip
Channels to give a secure join.
MuteClip
®
Installation Guide
Ceiling
Direct to Battened Concrete Ceiling
Battens to Concrete
MuteClip to Battens
1st Plasterboard to Channel
2nd Plasterboard to Channel
MuteClip Channel Overlap
Anchor Bolt
5mm x 60mm Coarse Thread Wood Screw
32mm Fine Thread Dry Wall Screw
50mm Fine Thread Dry Wall Screw
20mm Steel Self-Tapping Screw
Fixings
Suitability of fixings to be confirmed by installer.
-
-
-
-
-