2 INSTRUCTIONS
FOR
USE
MINIDUMPER
CARRY 107
13
2.7.4 CONCRETE
MIXER
KIT.
Concreting kit consists of a 250 lt. mixing vat, operated by an oleo dynamic motor. It is suitable to mix building
conglomerate, concrete or lime; composite mould or similar in seedling nursery field; fodder and similar in agricultural
field.
To obtain homogeneous mixings it is advised a rotation rating of the vat of about 24/25 revolution/min. to be obtained by
governing motor revolutions or by means governing of a standard valve.
Concreting kit can be installed only on predisposed machines with auxiliary power take-off
Loading in a defined place, mixing during travel and unloading of amalgamated material in a place even far, make that
accessory particularly versatile.
To unload do necessary manoeuvres, as indicated in 2-1-3.
It is linkable at self-loading shovel, useful also as conveyor during unloading.
TAKE CARE WITH THE POSITION OF THE SHOVEL DURING UNLOADING.
To carry out shovel loading, use the “shovel control lever” located next to the operator handle, following the instructions
given below:
•
Take the shovel on the ground
•
Operate the machine approaching it slowly to heap, until filling up completely
•
Lift the machine, by reducing the speed, when material unloading begins, in order to avoid material out of the
accessory or on the driver seat.
OPERATIONS
OF CHARGE
OPERATIONS
OF DISCARGE
CONTROL LEVER
SELF-LOADIN SHOVEL
REVOLUTION VALVE
VAT ADJUSTMENT
2.7.5 FOOTBOARD.
The footboard is hinged to the driving frame. In the closed position it allows safe driving
from the ground avoiding the danger of contact with the driver’s legs. In the open position
the operator can drive on board. A shock absorbing system reduces the vibrations
transmitted to the lower limbs. For complete operator safety, the footboard is fitted with a
clamping system (with spring retention) that prevents accidental closing.
2.7.6
USE OF THE AUXILIARY POWER PORTS
(Oil displacement 14 l/min.).
The ports of the auxiliary power take-off are located on the right
hand of the machine and protected by a cover.
For an easy use, please install quick hydraulic couplings size ¼ M
and ½ F.
To install the quick couplings, it is necessary to depressurize the
hydraulic circuit by loosening the oil fill cap of the machine,
removing the ports plugs and screw on the quick couplers with
the appropriate washers.
To pressurize again the hydraulic circuit, extend all the cylinders
and tighten the oil fill cap. (SEE POINT 3.7).
The oil flow is obtained by moving the lever f (shovel control
lever) and blocking it in position with the holder (SEE POINT 2.1.7).
2.7.7
USE OF THE AUXILIARY POWER PORTS HI FLOW (OPTIONAL)
(Oil displacement 26 l/min.).
The HI FLOW kit uses the same terminals as the standard AUX power takeoff (see point
2.7.6). It is advisable to replace the 1/4” quick coupling with a 3/8” quick coupling. For
complete flow rate delivery turn lever “A” as shown in the diagram. Machine travel is not
possible during use of the HI FLOW power takeoff.
A
ON
OFF