4 - HANDLING AND INSTALLATION
BOSS332/545/551 E-volution
GB
4 - Pag. 13 / 32
LEVELLING
• Insert the templates in the specially provided
holes in the beam.
• Check levelling by positioning the level crosswise
and lengthwise.
• Carry out the required connections by turning
the feet screws.