1
2
3
4
5
6
7
8
9
10
11
12
13
THE
ENERGY
FAMILY
(C) IDM Energiesysteme GmbH
Installation instructions TERRA AL Twin
21
1
2
3
4
800 mm
min
.
200 mm
heating side connections
condensation
run off
Well/pipe
300 mm
electrical connections
Canalisation
concrete base
300
925
1950
200
500
925
1950
200
200
The ground must be a
fi
rm and level
surface. It is possible to install concrete
bases or other good bearing compo-
nents. The load capacity must be guar-
anteed.
Placement and Installation
P
lac
ement
a
n
d
In
sta
lla
tion
Special actions have to be set for the appearing condensate. As a result of a defrosting circle
up to 15 lt. condensate within 2 minutes can occur. It must be ensured, that the condensate is
discharged. The condensate outlet must be secured by the pre-mounted heating cable.
Possible ground plan of the concrete base
Example 2
Example 1
4.15. Condensate run off