
Configuration and Commissioning
HR9Z-B2190 8/2020
71
Configuration Procedure
Step
Action
1
Verify that the device has been wired according to the safety-related function to be configured.
2
Remove power if the device is not powered off.
3
Open the transparent cover of the device.
4
Set the application function selector to the required application function.
5
Set the start function selector to the required start function.
6
Commission the device according to the chapter Commissioning
Summary of Contents for HR6S Series
Page 1: ...http www idec com HR6S AB Safety Module Original instructions HR9Z B2190...
Page 8: ...8 HR9Z B2190 8 2020...
Page 14: ...14 HR9Z B2190 8 2020...
Page 20: ...Introduction 20 HR9Z B2190 8 2020...
Page 54: ...Installation 54 HR9Z B2190 8 2020...
Page 80: ...Diagnostics 80 HR9Z B2190 8 2020...
Page 86: ...Accessories Service Maintenance and Disposal 86 HR9Z B2190 8 2020...