
15
mexico HE
-
Installation & Servicing
InstallatIon
The boiler is supplied fully assembled in Pack A.
A non-telescopic flue assembly for rear or side flue
outlet in Pack B is suppled as a separate order.
Unpack and check the contents.
pack A Contents
A The boiler
B These Installation & Servicing/User Instructions
C Floor standing template
D 1 year guarantee form
E Hardware Pack Box
11 UNpACKINg
pack B Contents
Flue terminal
1.
Fold back the top flaps and remove outer
sleeve.
2.
The Installation & Servicing/Users
Instructions can be found on top of the
boiler.
3.
Remove wood screw at bottom rear of
boiler, retaining the hardware pack box
and remove box.
4.
When the boiler is to be fitted to the pre
piping Frame (refer to Frame 21) remove
the top and inner sleeve and the boiler
from its wooden base.
The inner sleeve can be used to protect
the floor when fitting the boiler to the
pre-piping frame.
1.
Determine the position required for the boiler and tape template
into place.
Note.
The template gives positions for both wall
or flush with 600mm deep kitchen
units and the positional options
of the condensate pipe bracket
dependant upon boiler size. To
facilitate upward routing of
pipework behind boiler,
position the template
40mm (minimum) away
from the back wall.
2.
Using the floor
template, mark
the pre-piping
frame fixing holes,
the boiler fixing holes, the
condensate pipe support bracket fixing
holes and the flue hole (refer to Frame 14).
3.
Drill the 4 holes in the floor and screw the pre-
piping frame in place.
4.
Drill the 2 holes in the floor and screw the condensate pipe support bracket
in place. If the condensate pipe is to be fitted through the rear wall then fit a
short piece of plastic pipe to the bracket and mark the wall for drilling. Refer
to Frame 15 for condensate drain detail. When complete retain condensate
pipe with bracket clamp and fixing screws, protruding 20mm as shown.
5.
The gas, water flow and water return can now be connected.
Note.
Measure and cut out flue hole using template (Refer to Frame 14).
12 pACKAgINg REMOVAL
13 FITTINg AND CONNECTINg ThE pRE-pIpINg
FRAME/CONDENsATE pIpE sUppORT BRACKET
mxhe7570
B
D
C
A
E
mxhe7658
hardware pack Box Contents (E)
B
I
E
F
F
G
D
H
A
C
mex9220
A Pre-piping frame
B Flue turret
C Screws - 4 off
D Gasket
E Flue connector
F Screws - 5 off
G Condensate Pipe Bracket
H Flue turret lubricant
I Sealing washers - 3 off
(1 x
1
/
2
” gas and 2 x 22mm water connection)
mxhe7812
1
3
4
mxhe7983
Pre-piping
Frame
Clamp
20mm
Condensate
pipe support
bracket
IN
s
T
ALLA
TION
Summary of Contents for he15
Page 2: ...2 mexico HE Installation Servicing...
Page 50: ......