21
Concord Super Series 4 -
Installation & Servicing
LEGEND
1.
Injector washer
2.
Injector
3.
Gas outlet pressure test point
4.
Gas/air suction pressure test point
5.
Iron elbow - gas connection
6.
Gas/air control
7.
Gas inlet pressure test point
8.
Gas valve
9.
4mm sensing line
Note.
Items 6 & 8 supplied as an assembly
LEGEND
1.
LED’s
2.
Lockout reset button
3.
PCB No. 28
4.
Safety temperature limiter
5.
Mains socket
6.
Fan motor
7.
Fan impellor
8.
Fan scroll
8a.
Fan gasket
9.
Flame sensing lead
10.
Ignition lead
11.
PCB No. 29
12.
On/Off switch
13.
Thermostat knob
16 ELECTRICAL CONTROLS - Exploded View
17 GAS LINE
ASSEMBLY
Summary of Contents for Concord Super Series 4 100 V
Page 2: ......
Page 39: ...37 Concord Super Series 4 Installation Servicing ...