Concord ESi -
Installation and Servicing
27
INSTALLATION
38 BASIC CONNECTIONS
con9059
Option kit
AD212
1
Remove link
2
230 V main supply
3
Heating pump Circuit A
4
DHW pump
5
Boiler sensor
6
DHW sensor (AD212) - optional
The connector supplied in the AD212 kit
with the 22kOhm resistance and a 100nF capacitor,
must be plugged into terminals 20 and 21.
7
Boiler with or without DHW calorifier
8
Boiler with DHW calorifier
INST
ALLA
TION