14
Concord ESi
- Installation and Servicing
INSTALLATION
!
CON5263
*
'°
'°
'°
=
=
CON5262
11 BASE FRAME
12 ASSEMBLING THE HEATING BODY
-
Make the base frame level in both directions and ensure a
right angle.
-
14 to 20 sections boilers
: mount the central foot (1) on the
front of the base frame (this is only used to assemble the
sections).
*
The rear central foot is pre-assembled (14 to 20 sections
models).
-
Fix the 2 positioning brackets (2), supplied in the
accessories package, onto the base frame (on the left or
right-hand side**) using 2 H M6x25 screws.
** The side is to be determined according to the space
available in the boiler room (see Frame 7) and the
mounting direction chosen.
-
Put the first section (3) in place and fasten it to the brackets
(2) with 2 H8 x 30 H8 nuts + M8N washers
(washers on the cast iron side).
-
Coat the edges of the side section or the sealing grooves
with iron putty.
-
Fit the nipples in the connections after having cleaned and
coated them with a lubricant.
Note:
Assembled Boiler Bodies
In the case of an assembled body,
place the body on the base frame
and fasten it with the 2 squares (2),
then go to Frame 18.
INST
ALLA
TION