13
idealheating.com
12
welcome to our ideology
CHOOSING WHAT YOU NEED IS
STRAIGHTFORWARD:
Choose Frames:
select Standard or Low Height
Frames, or mount on a wall
Choose a Header:
select an Inline or Back to Back
configuration for the total number of boilers in the
cascade
Choose Hydraulic Separation:
select Plate Heat
Exchanger or Low Loss Header
Choose Pumps:
select the relevant pump for your
cascade
Choose Insulation:
select the insulation for a
Header, Separation and Pumps
A few things to bear in mind:
•
A Standard Height Inline or Back to Back cascade
can be for up to 6 boilers
•
A Low Height Inline cascade can be for up to 4
boilers
•
1 Standard Height Frame required for each boiler in
the cascade
•
1 pump required for each boiler in the cascade
The wide range of options available are detailed
on the pages overleaf. Alternatively, use our online
Evomax 2 Cascade Configurator tool to compile a
complete list of accessories for your cascade:
idealcommercialboilers.com/evomax2-cascade-
configurator
EVOMAX 2
CASCADE
30 - 900kW
EVOMAX 2 CASCADE
Frame & Header Kits
For installations requiring more
output delivered in a flexible
way, up to 6 Evomax 2 boilers
can be installed in a cascade.
An output of up to 900kW is
possible with this modular option
which is available in both Inline
(Standard and Low Height) and
Back to Back arrangements.
Cascade
control