![Ideal Heating ECOMOD HEAT PUMP CONTROL Installation And Servicing Download Page 60](http://html1.mh-extra.com/html/ideal-heating/ecomod-heat-pump-control/ecomod-heat-pump-control_installation-and-servicing_3612612060.webp)
Page 60 / 86
00U07310090-A
Ecomod Heat Pump Control -
Installation and Servicing
Heat Pump only with two Pre-Heating Tanks
2 or 3 DHW preheating tanks
Diagrams
HYF120
page 1 / 5
A. HYDRAULIC DIAGRAM
B. REGULATION ACCESSORIES REQUIRED
Quantity
Appliance reference
Order No.
Immersion sleeve sensor kit
2
QAZ 36
AH059261
C. DESCRIPTIONS
The HP supports DHW production during a time period with a configurable duration. Care will be
taken to ensure that draw-offs are virtually non-existent during this time period.
The HP supports DHW production during a time period with a configurable duration. Care will be
taken to ensure that draw-offs are virtually non-existent during this time period. This was defined
during the sizing study.
If it is deemed necessary to implement anti-Legionella cycles on the downstream gas-heated
tank, these will be covered by the gas generator. If anti-Legionella cycles are required on the
preheating tank(s), the solution shown does not contain the hydraulic or electrical elements used
to perform them. If this is to be expected, please contact our pre-sales department to choose the
most suitable solution for your installation. It should also be noted that the gas back-up is sized
to fulfil all DHW requirements on its own. This is an additional safety mechanism with regard to
extreme weather conditions that are not favourable to the HP’s operation.
figure 18 - Diagram HYF120